Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 19 páginas
Examen

3RD Class Stationary Steam Engineer License Prep Exam Questions And Answers 100% Correct

Document preview thumbnail
Vista previa 3 fuera de 19 páginas

3RD Class Stationary Steam Engineer License Prep Exam Questions And Answers 100% Correct

Vista previa del contenido

3RD Class Stationary Steam Engineer License Prep
Exam Questions And Answers 100% Correct


_________ are necessary for complete combustion - time, temperature, mixture, and atomization


if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - 214.7


a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The
blowdown is______psi - 12


an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo-
generator - steam turbine


a boiler is producing 40,000lb of steam/hr at a pressure of 100 PSI and a steam temperature of 500
degrees Fahrenheit. The steam produced is _______ steam - superheated


the economizer on a boiler is used to _______ - add heat to the feed water


blowers are normally used with________ boilers - water tube


overheating of tubes on a boiler can be caused by________ - scale on tubes


carbon dioxide in a condensate return system causes_________ - channeling


a ________ pump is a positive displacement pump - reciprocating


a boiler generating 6000 lb of steam/hr produces _______btu/hr - 6,000,000


a bottom blowdown is performed on a boiler to _____ - discharge sludge and sediment

,water columns are connected to the boiler with a minimum of _______" pipe - 1


the minimum size of a water column blowdown valve is_______". - 3/4


the maximum size bottom blowdown valve on a boiler is_________". - 2 1/2


a ________ allows condensate to pass through, but stops Steam. - a steam trap


when taking over a shift, the first thing to do is check the________ - water level in each boiler


according to the asme code, a high-pressure boiler having more than 500 square feet of heating
surface shall have________ - two or more safety valves


the probable cause of an increase in temperature of gases of combustion at the boiler Outlet is____ -
dirty heating services


boilers in battery equipped with________ must have two main steam stop valves and a free-flowing
drain between them - manhole openings


in order to be sure the gauge glass is indicating an accurate water level reading, the stationary
engineer should______ - blowdown the gauge glass


a continuous blowdown line is located___ - in the Steam and water drum well below the nowl


a temperature reading of 80 degrees Celsius is equal to_________°f - 176


a chimney temperature of 250 degrees Fahrenheit above steam temperature indicates_______ - poor
efficiency


a manometer is red in________ - inches of water

, the boiling point of water will____ with an increase in pressure - be raised


if a lather is not obtained when performing a soap hardness test, the water sample is_______ - hard


combustion efficiency can be increased when air is________ - preheated


______ draft is produced by a fan located between the boiler and the chimney - induced


the overspeed trip on a steam turbine should be tested ______ - before putting the steam turbine on-
line


a high CO2 reading in the gases of combustion is a sign of____ - High combustion efficiency


the purpose of chemically treating feedwater is to________ - turn scale-forming salts to a non
adhering sludge


water in a d rating feed water heater is prevented from entering the steam line by a(n) _______. - Loop
seal or internal overflow


a steam turbine operating at 3600 RPM will trip at_________ rpm - 3960


he steam line going to The Blowers is connected to the main ________ - steam drum


before using blowers on a boiler,________ - drain set blower lines


an accumulation of snow on the Fireside of a boiler tubes________ - decreases boiler efficiency


a globe valve installed in the feed water line between the feed water pump and boiler has a pressure
from the feed water pump_________ the valve disc - under

Información del documento

Subido en
26 de febrero de 2023
Número de páginas
19
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Stuviatlas
3.8
(436)
Vendido
1871
Seguidores
1470
Artículos
7359
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes