Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 34 páginas
Otro

Getta Byte Software Project FINALMGMT404

Document preview thumbnail
Vista previa 4 fuera de 34 páginas

Crystal Persad Devry University Professor Teodor Sauca 26th August, 2020 Getta Byte Software Project Getta Byte Software project Contents 1. Introduction..............................................................................................................................3 1.1 Project goals and objectives..............................................................................................3 1.2 Management of the project...............................................................................................4 1.3 Internal and external factors that may affect processes and procedure of the project......4 2 Stakeholder Engagement Plan...............................................................................................10 3 Communication management plan........................................................................................11 4 Project Scope Statement........................................................................................................13 5 WBS And the Project Schedule.............................................................................................16 5.1 WBS................................................................................................................................16 5.2 Project scheduling...........................................................................................................18 6 Resource Allocation...............................................................................................................20 7 Cost Overview.......................................................................................................................23 8 Risk Register..........................................................................................................................26 9 Conclusion.............................................................................................................................28 10 References..............................................................................................................................28 2 Getta Byte Software project 1. Introduction 1.1 Project goals and objectives The Getta Byte Software project is a mission that is formed with the main goal in mind of replacing the current manual billing system with an online software-based system that will enable accurate, easy and fast data entry system. It is worth noting that the existing system has the capability of helping the company to carry out the duties in daily operations. This is quite fine, but there are a few challenges that calls for an online system. The first concern is that the existing system is manual and therefore, time consuming and very inaccurate. A lot of time is needed in entering the information into the system and the end result is the inconsistency of the information entered and therefore, putting the company at risk. The solution to this problem is to come up with an automated system that shall be very fast and produce accurate data. The system shall be base on online operation which will enhance an easy way of entering the data, conceive a dynamic update towards the receivables. The system shall have a goal of saving up to 25 % of the total labor per month since, human resources to operate the billing system shall be reduced. The extra cost saved by the company shall be used elsewhere and hence, raising the total profits made by the company each month. The project focuses towards working with a bunch of people to spread risks in the company. These people shall include the CFO, CEO the billing department and also customer care services. The success of the project shall be attributed to the fact that the billing cycles are reduced to more than 30% each month.


Información del documento

Subido en
6 de octubre de 2022
Número de páginas
34
Escrito en
2021/2022
Tipo
Otro
Personaje
Desconocido
$18.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NursesHub
4.7
(665)
Vendido
1136
Seguidores
691
Artículos
2308
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.