• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 23 páginas
Otro

MGMT 404 Course Project: Getta Byte Software Project |Getta Byte Software project final.2020/2021|DeVry University

Document preview thumbnail
Vista previa 3 fuera de 23 páginas

MGMT 404 Course Project: Getta Byte Software Project |Getta Byte Software project final.2020/2021|DeVry University

Vista previa del contenido

Running Head: Getta Byte Software project




Crystal Persad

Devry University

Professor Teodor Sauca

31st July, 2020

Getta Byte Software Project

,Getta Byte Software project


Contents
1. Introduction..............................................................................................................................3

1.1 Project goals and objectives..............................................................................................3

1.2 Management of the project...............................................................................................4

1.3 Internal and external factors that may affect processes and procedure of the project......4

2 Stakeholder Engagement Plan...............................................................................................10

3 Communication management plan........................................................................................11

4 Project Scope Statement........................................................................................................13

5 WBS And the Project Schedule.............................................................................................16

5.1 WBS................................................................................................................................16

5.2 Project scheduling...........................................................................................................18

6 References..............................................................................................................................20




2

, Getta Byte Software project


1. Introduction
1.1 Project goals and objectives

The Getta Byte Software project is a mission that is formed with the main goal in mind of

substituting the on-going manual online-based billing system that will enable a concise, easy, and

fast data entry system. It is worth noting that the existing system has the capability of helping the

company to carry out the duties in daily operations. This is quite fine, but there are a few

challenges that call for an online system. The first concern is that the existing system is manual

and, therefore, time-consuming and very inaccurate. A lot of time is needed in entering the

information into the system, and the result is the inconsistency of the data entered and, therefore,

putting the company at risk. The solution to this problem is to come up with an automated

system that shall be very fast and produce accurate data. The system shall be base on the online

operation, which will enhance an easy way of entering the data, conceive a dynamic update

towards the receivables. The system shall have a goal of saving up to 25 % of the total labor per

month since human resources to operate the billing system shall be reduced. The extra cost saved

by the company shall be used elsewhere and hence, raising the total profits made by the company

each month. The project focuses on working with a bunch of people to spread risks in the

company. These people shall include the CFO, CEO, the billing department, and also customer

care services. The success of the project shall be attributed to the fact that the billing cycles are

reduced to more than 30% each month.

As per the project schedule, it is expected that the first piloting shall be done by September

1st. This shall imply that the development and testing of the software shall be done by 15th

August. This shall give an ample time to facilitate the first piloting study and see if the system is

working correctly and in accordance to the expectations and goals of the project. The final real


3

Información del documento

Subido en
16 de julio de 2022
Número de páginas
23
Escrito en
2021/2022
Tipo
Otro
Personaje
Desconocido
$16.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
academia1434
3.6
(53)
Vendido
408
Seguidores
368
Artículos
930
Última venta
9 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes