• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 1 fuera de 3 páginas
Examen

DAU ISA 101 Module 2 Test

Document preview thumbnail
Vista previa 1 fuera de 3 páginas

DAU ISA 101 Module 2 Test Capability Planning Exam Here is your test result.The dots represent the choices you have made. The highlighted questions are the questions you have missed. Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y' represents visited links. Back to Status page contains 6 Questions 1) You've identified a capability requirement that, if left unresolved, would lead to a critical mission failure. What capability document must you complete? [7.101.1.1 Given an overview of the DoD capability planning processes, its objectives and expected results, identify capability planning documents from a list.] UON ICD DCR Joint DCR 2) True or False. Performance Measures are identified in the Capability Need Identification phase of the BCAC. [7.101.1.2 Describe the Business Capability Acquisition Lifecycle (BCAC) model.] False True 3) True or False. Once an ICD is documented AND approved, it is not updated. [7.101.1.7 Identify the role of the ICD and IS ICD in the JCIDS process.] False True 4) What are key documents used specifically with Information Technology (IT) to define Information Technology capability requirements? (Select the two that apply.) [7.101.1.8 Identify how Sponsors use the ICD and IS ICD/IT Box to document IT capability requirements.]  IS ICD LCSP and TEMP SEP and ISP  IT Box 5) A Request for Proposal (RFP) is validated by the . (Fill in the blank.) [7.101.1.9 Identify the role of the CDD in the JCIDS process.] CDD CPD ICD Joint DCR 6) Match the JCIDS document to the appropriate characteristic. [7.101.1.10 Identify the role of the CPD in the JCIDS process.] a) IS ICD b) ICD c) CDD d) CPD e) Joint DCR f) UON Uses expedited staffing and validation procedures to enable the timely validation and initiation of rapid acquisition efforts. Leads to an AoA or similar review when a materiel approach to solving the capability gap and/or requirements is appropriate. Provides KPPs, KSAs and additional operational performance attributes that support the Technology Maturation & Risk Reduction Phase (TMRR) as well as the Engineering & Manufacturing Development (EMD) phase. Documents capability requirements and associated gaps where the intended solution approach involves the application of system software. Prepared during the Engineering and Manufacturing Development Phase and is used as an entrance criteria item necessary for each Milestone C acquisition decision. Proposes non-materiel capability solutions in one or more of the DOTmLPF-P areas as an alternative to, or compliment of, materiel capability solutions.

Vista previa del contenido

DAU Page 1 of 2




DAU ISA 101 Module 2 Test


Capability Planning Exam
Here is your test result.The dots represent the choices you have
made. The highlighted questions are the questions you have
missed.
Remediation Accessed shows whether you accessed those links.'N' represents links not
visited and 'Y' represents visited links.
Back to Status page
contains 6 Questions


1) You've identified a capability requirement that, if left unresolved, would lead to a critical
mission failure. What capability document must you complete? [7.101.1.1 Given an overview of
the DoD capability planning processes, its objectives and expected results, identify capability planning
documents from a list.]


UON

ICD

DCR

Joint DCR


2) True or False. Performance Measures are identified in the Capability Need Identification phase
of the BCAC. [7.101.1.2 Describe the Business Capability Acquisition Lifecycle (BCAC) model.]

False
True

3) True or False. Once an ICD is documented AND approved, it is not updated. [7.101.1.7 Identify
the role of the ICD and IS ICD in the JCIDS process.]

False

True

4) What are key documents used specifically with Information Technology (IT) to define
Information Technology capability requirements? (Select the two that apply.) [7.101.1.8 Identify
how Sponsors use the ICD and IS ICD/IT Box to document IT capability requirements.]
 IS ICD

LCSP and TEMP

SEP and ISP
 IT Box


DAU

Información del documento

Subido en
4 de abril de 2022
Número de páginas
3
Escrito en
2022/2023
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BestSolutions
4.8
(53)
Vendido
173
Seguidores
135
Artículos
2995
Última venta
1 año hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes