Summary Acknowledgements
The PQS Development Group gratefully acknowledges the assistance of the following personnel in writing this PQS: LCDR Michael H. SUMRALL COMSUBPAC (QAO), Pearl Harbor, HI LT Peter M. CYR COMSUBLANT (QAO), Norfolk, VA DCC (SW) Benjamin R. HEARD COMNAVSURFPAC, San Diego, CA GSMC (SW) Harry L. RUF USS THOMAS S. GATES (CG 51) MM1 (SS) James R. BENEFIEL USS MARYLAND (SSBN 738 BLUE) MM1 (SW) Joseph S. CANNON USS JOHN F. KENNEDY (CV 67) Mr. William E. FERGUSON CINCLANTFLT, Norfolk, VA Mr. Edward J. KRUER JR. COMNAVAIRLANT, Norfolk, VA Mr. Ronald R. REEVES COMNAVSURFLANT, Norfolk, VA Mr. Gregory L. RICHARDS COMNAVAIRPAC, San Diego, CA PQS Development Group personnel who provided direct support for this PQS. AVCM (AW) Robert CLAIRE LCPO GMC (SW) James ALLEN Production Officer EMCS (SW) Oscar MERINO Branch Head ENC (SW) Edward CONNOR Workshop Supervisor ATC (AW) Raymond LEAMONS Asst. Workshop Supervisor Ms. Delphine LONG Editor Ms. Gail L. GRUSENSKI Editorial Assistant The Model Manager for this PQS: CINCLANTFLT (N4342) DSN # 836-3754 5 INTRODUCTION PQS PROGRAM This PQS program is a qualification system for officers and enlisted personnel where certification of a minimum level of competency is required prior to qualifying to perform specific duties. A PQS is a compilation of the minimum knowledge and skills that an individual must demonstrate in order to qualify to stand watches or perform other specific routine duties necessary for the safety, security or proper operation of a ship, aircraft or support system. The objective of PQS is to standardize and facilitate these qualifications. CANCELLATION This Standard cancels and supersedes NAVEDTRA 43523-A. APPLICABILITY This PQS is applicable to all personnel under the cognizance of CINCLANTFLT and CINCPACFLT. TAILORING To command tailor this package, first have it reviewed by one or more of your most qualified individuals. Delete any portions covering systems and equipment not installed on your ship, aircraft or unit. Next, add any line items, fundamentals, systems and watchstations/workstations that are unique to your command but not already covered in this package. Finally, the package should be reviewed by the cognizant department head and required changes approved by the Commanding Officer or his designated representative. Retain the approved master copy on file for use in tailoring individual packages. QUALIFIER The PQS Qualifier is designated in writing by the Commanding Officer to sign off individual watchstations. Qualifiers will normally be E-5 or above and, as a minimum, must have completed the PQS they are authorized to sign off. The names of designated Qualifiers should be made known to all members of the unit or department. The means of maintaining this listing is at the discretion of individual commands. For more information on the duties and responsibilities of PQS Qualifiers, see the PQS Management Guide. 6 INTRODUCTION (CONT’D) CONTENTS PQS is divided into three sections. The 100 Section (Fundamentals) contains the fundamental knowledge from technical manuals and other texts necessary to satisfactorily understand the watchstation/workstation duties. The 200 Section (Systems) is designed to acquaint you with the systems you will be required to operate at your watchstation/workstation. The 300 Section (Watchstations) lists the tasks you will be required to satisfactorily perform in order to achieve final PQS qualification for a particular watchstation/workstation. All three sections may not apply to this PQS, but where applicable, detailed explanations are provided at the front of each section. REFERENCES The references used during the writing of this PQS package were the latest available to the workshop, however, the most current references available should be used when qualifying with this Standard. NOTES Classified references may be used in the development of PQS. If such references are used, do not make notes in this book as answers to questions in this Standard may be classified. TRAINEE Your supervisor will tell you which watchstations/workstations you are to complete and in what order. Before getting started, turn to the 300 Section first and find your watchstation/workstation. This will tell you what you should do before starting your watchstation/workstation tasks. You may be required to complete another PQS, a school, or other watchstations/workstations within this package. It will also tell you which fundamentals and/or systems from this package you must complete prior to qualification at your watchstation/workstation. If you have any questions or are unable to locate references, contact your supervisor or qualifier. Good luck! PQS FEEDBACK REPORTS This PQS was developed using information available at the time of writing. When equipment and requirements change, the PQS needs to be revised. The only way the PQS Development Group knows of these changes is by you, the user, telling us either in a letter or via the Feedback Report contained in the back of this book. You can tell us of new systems and
Información del documento
- Subido en
- 18 de febrero de 2022
- Número de páginas
- 138
- Escrito en
- 2021/2022
- Tipo
- Resumen