• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 37 páginas
Examen

MECHANIC 102 The Managerial Process ANSWER KEY SOLVED Chapter 6 (MECHANIC102)

Document preview thumbnail
Vista previa 4 fuera de 37 páginas

Exam (elaborations) MECHANIC 102 The Managerial Process ANSWER KEY SOLVED Chapter 6 (MECHANIC102) Chapter 06 Developing a Project Plan Answer Key Multiple Choice Questions 1. Information to develop a project network is collected from the A. Organization breakdown structure B. Work breakdown structure C. Budget D. Project proposal E. Responsibility matrix The network is developed from the information collected for the WBS and is a graphic flow chart of the project job plan. AACSB: Reflective Thinking Bloom's: Comprehension Learning Objective: Developing the Project Network Level: Easy 2. Which of the following represents an activity on an AON project network? A. An arrow B. A line C. A node D. Both A and B are correct E. A, B, and C are all correct The two approaches used to develop project networks are known as activity-on-node (AON) and activity-on-arrow (AOA). Both methods use two building blocks— the arrow and the node. Their names derive from the fact that the former uses a node to depict an activity. AACSB: Reflective Thinking Bloom's: Knowledge Learning Objective: Constructing a Project Network Level: Easy 6-1 MECHANIC 102 The Managerial Process ANSWER KEY SOLVED Chapter 6 Developing a Project Plan Chapter 06 - Developing a Project Plan 3. Arrows on an AON project network represent: A. An activity B. Project flow C. Dependency D. Both B and C are correct E. Both A and B are correct The node depicts an activity, and the arrow shows dependency and project flow. AACSB: Reflective Thinking Bloom's: Knowledge Learning Objective: From Work Package to Network Level: Medium 4. When translated into a project network, a work package will become A. A single activity B. One or more activities C. A milestone D. A critical path E. An arrow Work packages from the WBS are used to build the activities found in the project network. An activity can include one or more work packages. The activities are placed in a sequence that provides for orderly completion of the project. AACSB: Analytic Bloom's: Comprehension Learning Objective: From Work Package to Network Level: Medium 6-2 Chapter 06 - Developing a Project Plan 5. Which of the following is provided by a project network but not by the work breakdown structure? A. Dependencies B. Sequencing C. Interrelationships D. Both A and B are correct E. A, B, and C are all correct Project networks are developed from the WBS. The project network is a visual flow diagram of the sequence, interrelationships, and dependencies of all the activities that must be accomplished to complete the project. AACSB: Reflective Thinking Bloom's: Knowledge Learning Objective: From Work Package to Network Level: Medium 6. On a project network, the activity times are derived from the A. Organization breakdown structure B. Work packages C. Budget D. Project proposal E. Responsibility matrix Work packages from the WBS are used to build the activities found in the project network. An activity is an element in the project that consumes time—for example, work or waiting. AACSB: Analytic Bloom's: Comprehension Learning Objective: From Work Package to Network Level: Difficult 6-3 Chapter 06 - Developing a Project Plan 7. Part of a project is to Develop Product Specifications. This is best classified as a(n) A. Event B. Path C. Activity D. Node E. Milestone Activities usually represent one or more tasks from a work package. Descriptions of activities should use a verb/noun format: for example, develop product specifications. AACSB: Analytic Bloom's: Knowledge Learning Objective: Constructing a Project Network Level: Medium 8. An activity that has more than one dependency arrow flowing into it is termed a(n) A. Parallel activity B. Critical path C. Burst activity D. Merge activity E. Independent activity Merge activity is an activity that has more than one activity immediately preceding it (more than one dependency arrow flowing to it). AACSB: Reflective Thinking Bloom's: Knowledge Learning Objective: Constructing a Project Network Level: Easy 6-4 Chapter 06 - Developing a Project Plan 9. The critical path in a project network is the A. Shortest path through the network B. Longest path through the network C. Network path with the most difficult activities D. Network path using the most resources E. Network path with the most merge activities When this term is used, it means the path(s) with the longest duration through the network; if an activity on the path is delayed, the project is delayed the same amount of time. AACSB: Reflective Thinking Bloom's: Comprehension Learning Objective: Constructing a Project Network Level: Medium 10. A/an _________ activity has more than one dependency arrow flowing from it. A. Parallel B. Critical path C. Burst D. Merge E. Independent Burst activity is an activity has more than one activity immediately following it (more than one dependency arrow flowing from it). AACSB: Analytic Bloom's: Comprehension Learning Objective: Constructing a Project Network Level: Easy 6-5 Chapter 06 - Developing a Project Plan 11. An item on a project network is Design Software Completed. This is best described as a(n) A. Event B. Path C. Activity D. Node E. Milestone Event is a term used to represent a point in time when an activity is started or completed. It does not consume time. AACSB: Reflective Thinking Bloom's: Knowledge Learning Objective: Constructing a Project Network Level: Easy 12. Activities which can take place at the same time are termed A. Parallel activity B. Critical path C. Burst activity D. Merge activity E. Independent activity These are activities that can take place at the same time, if the manager wishes. However, the manager may choose to have parallel activities not occur simultaneously. AACSB: Analytic Bloom's: Knowledge Learning Objective: Constructing a Project Network Level: Easy 6-6 Chapter 06 - Developing a Project Plan 13. A sequence of connected, dependent activities is termed a(n) A. Critical path B. Parallel path C. Activity chain D. Path E. Dependent chain A Path is a sequence of connected, dependent activities. AACSB: Reflective Thinking Bloom's: Knowledge Learning Objective: Constructing a Project Network Level: Easy 14. An AON project network uses which of the following basic building blocks? A. Arrows B. Bars C. Nodes D. Both A and C are correct E. A, B, and C are all correct The two approaches used to develop project networks are known as activity-on-node (AON) and activity-on-arrow (AOA). Both methods use two building

Vista previa del contenido

MECHANIC 102 The Managerial
Process ANSWER KEY SOLVED Chapter
Chapter 06 - Developing a Project Plan

6 Developing a Project Plan
Chapter 06 Developing a Project Plan Answer Key



Multiple Choice Questions



1. Information to develop a project network is collected from the
A. Organization breakdown structure
B. Work breakdown structure
C. Budget
D. Project proposal
E. Responsibility matrix

The network is developed from the information collected for the WBS and is a graphic flow
chart of the project job plan.


AACSB: Reflective Thinking
Bloom's: Comprehension
Learning Objective: Developing the Project Network
Level: Easy



2. Which of the following represents an activity on an AON project network?
A. An arrow
B. A line
C. A node
D. Both A and B are correct
E. A, B, and C are all correct

The two approaches used to develop project networks are known as activity-on-node (AON)
and activity-on-arrow (AOA). Both methods use two building blocks— the arrow and the
node. Their names derive from the fact that the former uses a node to depict an activity.


AACSB: Reflective Thinking
Bloom's: Knowledge
Learning Objective: Constructing a Project Network
Level: Easy




6-1

,Chapter 06 - Developing a Project Plan



3. Arrows on an AON project network represent:
A. An activity
B. Project flow
C. Dependency
D. Both B and C are correct
E. Both A and B are correct

The node depicts an activity, and the arrow shows dependency and project flow.


AACSB: Reflective Thinking
Bloom's: Knowledge
Learning Objective: From Work Package to Network
Level: Medium



4. When translated into a project network, a work package will become
A. A single activity
B. One or more activities
C. A milestone
D. A critical path
E. An arrow

Work packages from the WBS are used to build the activities found in the project network.
An activity can include one or more work packages. The activities are placed in a sequence
that provides for orderly completion of the project.


AACSB: Analytic
Bloom's: Comprehension
Learning Objective: From Work Package to Network
Level: Medium




6-2

,Chapter 06 - Developing a Project Plan



5. Which of the following is provided by a project network but not by the work breakdown
structure?
A. Dependencies
B. Sequencing
C. Interrelationships
D. Both A and B are correct
E. A, B, and C are all correct

Project networks are developed from the WBS. The project network is a visual flow diagram
of the sequence, interrelationships, and dependencies of all the activities that must be
accomplished to complete the project.


AACSB: Reflective Thinking
Bloom's: Knowledge
Learning Objective: From Work Package to Network
Level: Medium



6. On a project network, the activity times are derived from the
A. Organization breakdown structure
B. Work packages
C. Budget
D. Project proposal
E. Responsibility matrix

Work packages from the WBS are used to build the activities found in the project network.
An activity is an element in the project that consumes time—for example, work or waiting.


AACSB: Analytic
Bloom's: Comprehension
Learning Objective: From Work Package to Network
Level: Difficult




6-3

, Chapter 06 - Developing a Project Plan



7. Part of a project is to Develop Product Specifications. This is best classified as a(n)
A. Event
B. Path
C. Activity
D. Node
E. Milestone

Activities usually represent one or more tasks from a work package. Descriptions of activities
should use a verb/noun format: for example, develop product specifications.


AACSB: Analytic
Bloom's: Knowledge
Learning Objective: Constructing a Project Network
Level: Medium



8. An activity that has more than one dependency arrow flowing into it is termed a(n)
A. Parallel activity
B. Critical path
C. Burst activity
D. Merge activity
E. Independent activity

Merge activity is an activity that has more than one activity immediately preceding it (more
than one dependency arrow flowing to it).


AACSB: Reflective Thinking
Bloom's: Knowledge
Learning Objective: Constructing a Project Network
Level: Easy




6-4

Información del documento

Subido en
14 de diciembre de 2021
Número de páginas
37
Escrito en
2021/2022
Tipo
Examen
Contiene
Preguntas y respuestas
$4.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Expert001
4.4
(230)
Vendido
845
Seguidores
567
Artículos
1469
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes