• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 16 páginas
Examen

NERC RC Exam Study Material - Fully Updated Solutions

Document preview thumbnail
Vista previa 3 fuera de 16 páginas

NERC RC Exam Study Material - Fully Updated Solutions What is ACE? - answer - (NIa - NIs) - 10β(fa - fs) - Ime Calculated every 6 seconds Uses Tie line Frequency Bias What is Tie line deviation? - answer - Largest offset to ACE What is NIA? - answer - Net Interchange Actual (sum of all tie-line values) What is NIS? - answer - Net Interchange Scheduled (sum of all interchange schedules) What is the multiplier for frequency bias? - answer - 10 What is β? - answer - Frequency bias - represented as negative number in ACE calculation - reflects area natural response to frequency changes (Inertia, Governor, Load) - atleast 1% of annual peak load for areas with native load - 1% of peak generation output for area with no load What is FA? - answer - Frequency Actual What is FS? - answer - Frequency Schedule - normally 60.00 HZ except for time corrections - +/- .02 Hz What is IME? - answer - Meter error fudge factor used for inadvertent bilateral payback Negligible What should be done if unable to calculate ACE for 30 minutes? - answer - Contact RC How often should time error and frequency devices be checked/calibrated? - answer - Annually Negative Ace - answer - The BA is Undergenerating Positve ACE - answer - The BA is Overgenerating What happens during Internal Loss of Load? - answer - Frequency and ACE increase. What happens during External Loss of Load? - answer - Frequency increases, no change in ACE. What is the Frequency Bias Setting? - answer - Monthly average = 1% of estimated yearly peak demand per 0.1 Hz When should the Balancing Authority recalculate its Frequency Bias Setting? - answer - By January 1 of each year What happens when there is internal generation loss? - answer - Frequency and ACE drop, tie-line flows increase into the system What happens when there is external generation loss? - answer - Frequency drops, no change in ACE, net tie-line flows increase out of the system What happens when Frequency bias setting is lower than frequency response? - answer - ACE will be positive causing the AGC to lower generation What is the percentage change in load required for a 1% change in frequency? - answer - 1% - 2% change in load What is the load reduction when Transmission Customer Voltage is reduced by 5%? - answer - Load will reduce by 3% What happens to ACE and AGC when the frequency bias setting is set to a less negative value than the frequency response of a Balancing Authority and a frequency increase is caused by a sudden loss of load in an external balancing area? - answer - ACE will be a negative value and AGC will increase generation What happens to ACE and AGC when the frequency bias setting is less negative than the frequency response of a Balancing Authority and a frequency decline is caused by a sudden loss of generation in an external balancing area? - answer - ACE will be a positive value and AGC will lower generation What is the normal schedule frequency? - answer - 60.00 Hz What is the frequency correction for fast clock schedule? - answer - 59.98 Hz What is the frequency corrections for a slow clock schedule? - answer - 60.02 Hz When does frequency increase? - answer - Generation increases or load decreases When does frequency decrease? - answer - Generation decreases or load increases Who is the Time Monitor? - answer - Can only be RC one per Interconnection Who is designated as Interconnection Time Monitor? - answer - Single RC designated by NERC Operating Committee When can a time error correction be cancelled? - answer - with 30% BAs in area requests What is the minimum duration for time error correction? - answer - 1 hour When does time error correction start? - answer - On the hour or half-hour What are the standards for time error correction? - answer - NAESB standards (North American Energy Standards Board) Who can request a termination? - answer - Any Reliability Coordinator What is the notification time to start or stop a time error schedule? - answer - 60


Información del documento

Subido en
9 de noviembre de 2026
Número de páginas
16
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
SARAHnkalu
4.6
(7)
Vendido
50
Seguidores
0
Artículos
9092
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.