Question 1.
Project schedules should be updated at least ______________ once the project has started,
ANSWER
Weekly
Question 2.
The size and route of sanitary sewer lines are indicated in the ________ drawings.
ANSWER
P Drawing
Question 3.
Which of the following documents is used to track daily activities at the work site?
ANSWER
Project Log
Question 4.
Which of the following is submitted to request clarification, supplemental information, or approval of material substitutions?
ANSWER
RFI Form
Question 5.
M drawings indicate the size and route of:
ANSWER
Air Handler Units, Chilled Water Piping, Refrigerant Piping, HVAC System Ducts
Question 6.
Which of the following testers should be used for optical fiber identification?
ANSWER
Visual Fault Locator (VFL)
Question 7.
What is the first step that you should take to verify the existing infrastructure before you begin a retrofit?
ANSWER
Review the existing documentation with the customer.
, Question 8.
A graphical representation of a building space, or object prepared with adequate detail to convey design information in a manner to
serve as a guide for construction.
ANSWER
A Drawing
Question 9.
A graphical representation of the electrical components of a construction project (e.g., power distribution, lighting).
ANSWER
E Drawing
Question 10.
Abbreviation for fire protection drawings
ANSWER
FP Drawing
Question 11.
Abbreviation for mechanical drawings.
ANSWER
M Drawing
Question 12.
Abbreviation for plumbing drawings
ANSWER
P Drawing
Question 13.
Abbreviation for structural drawings
ANSWER
S Drawing
Question 14.
This document covers the requirements for the ICT systems team and lists all of the elements of the installation.
ANSWER
Scope of Work (SOW)
Question 15.
Abbreviation for telecommunications, security, and audiovisual drawings
ANSWER
T Drawing
, Question 16.
Layer of a telecommunication drawing that contains campus or site information such as exterior pathways and interbuilding systems
ANSWER
T0 Layer
Question 17.
Layer of a telecommunication drawing that contains building information.
ANSWER
T1 Layer
Question 18.
Layer of a telecommunication drawing that contains serving zone information
ANSWER
T2 Layer
Question 19.
Layer of a telecommunication drawing that contains information about telecommunications rooms.
ANSWER
T3 Layer
Question 20.
Layer of a telecommunication drawing that contains the detail drawings.
ANSWER
T4 Layer
Question 21.
Layer of a telecommunication drawing that contains schedules and spreadsheets.
ANSWER
T5 Layer
Question 22.
A list of the quantity and specific types of materials to be used on a project. This list also should consider miscellaneous hardware.
ANSWER
BOM
Question 23.
Abbreviation for operations and maintenance
ANSWER
O&M