• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 23 páginas
Examen

DBIA 2026 Examination Study Material - Full Answer Key Verified

Document preview thumbnail
Vista previa 3 fuera de 23 páginas

DBIA 2026 Examination Study Material - Full Answer Key Verified DBIA Document 580 - Teaming Agreement - answer - Between Design-Builder and teaming party Components of Teaming Agreement - answer - qualifications, insurance, matrix of responsibilities, confidentiality and exclusivity, payment of stipend/honoarrium URS CORP v TRANSPO - does teaming agreement waiver survive if subcontract supersedes teaming agreement? - answer - yes. subcontract was silent, waiver in prime flowed down. Common Procurement Challenges - answer - - conducting proprietary meetings - handling alternative technical concepts - evaluating non-price factors - consideration of all proposal information - use of work product fo unsuccessful proposers Standard form contracts - answer - - reflect industry consensus on risk allocation - predictable judicial interpretation - convenient and cost effective Current US Standard Form Contracts - answer - - DBIA (2010/2016) - Consensus Docs (2016) - AIA (2014) - EJDC (2016) DBIA OWNER/DESIGN-BUILDER AGREEMENTS - answer - - 520 Preliminary Agreement - 525 Lump Sum - 530 Cost Plus Fee with Option for GMP - 535 General Conditions - 545 Progressive Design-Build Contract for the Water/Wastewater Sector Contracting Approaches - answer - - Lump Sum - Cost Plus - GMP - Unit Prices - Target Pricing LUMP SUM (DBIA 525) - answer - - single price regardless of actual cost - no meaningful opportunity for Owner to be involved in subcontractor procurement - no transparency into lump sum price - limited audit rights - undisclosed contingencies COST PLUS/GMP (DBIA 530) - answer - - compensation based on actual cost plus fee up to GMP - owner had broad audit rights - owner has ability to be more involved ins subcontractor procurement - most contingencies are transparent - savings needs to be addressed - administratively more complex GMP PROCESS ISSUES - answer - - Timing of the GMP - Assumptions (schedule) - Contingency - Savings - Line item guarantees; not contemplated, general conditions could be capped Progressive Design-Build (PDB) - answer - - Design-builder retained by Owner early in projects's life primarily, if not exclusively, on qualifications - Final project cost and schedule commitment is not established as part of the selection process - Two phases of work: preliminary services, & final design and construction, once the parties have agreed on price and other commercial terms - GMP contract is often used PDB Process - answer - - Design-builder collaborates with Owner during Phase 1 to create or confirm project's BOD - Formal commercial proposal for Phase 2: "appropriate" level of definition often at 40-60% design; dependent on amount of control Owner desires to maintain over design definition and contingency - Phase 2 initiated upon acceptance of commercial proposal PDB Two-contract approach - answer - - parties first enter into a preliminary agreement, such as DBIA 520 (Preliminary Agreement) - if commercial proposal is accepted, parties then enter into a full design-build contract such as DBIA 530 (Cost-plus with GMP) PDB Single contract approach - answer - - parties enter into a full design-build contract (DBIA 530) or for water/wastewater, DBIA 545 - these contracts establish the GMP after contract award Progressive Design-Build Issue - answer - Deciding what happens if relationship ends and the "off-ramp" is exercised: - owner's right to use work product - owner's ability to use the designer without the builder OWNER'S REVIEW OF DESIGN SUBMISSIONS (DBIA 535) - answer - §2.4.1 On or about the time of the scheduled submissions, Design- Builder and Owner shall meet and confer about the submissions, withDesign-Builder identifying during the meeting, among other things, the evolution of the design and any significant changes or deviations that have taken place from previous design submissions. §2.4.3 Neither Owner's review nor approval of any interim design submissions, meeting minutes, and Construction Docum


Información del documento

Subido en
29 de octubre de 2026
Número de páginas
23
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
SARAHnkalu
4.6
(7)
Vendido
43
Seguidores
0
Artículos
5318
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.