Examen

The Nevada C-21B Air Conditioning Contractor License Examination, administered by PSI under the authority of the Nevada State Contractors Board (NSCB), evaluates prospective contractors on mechanical codes, refrigeration theory, electrical requirements, l

Document preview thumbnail
Vista previa 4 fuera de 109 páginas

The Nevada C-21B Air Conditioning Contractor License Examination, administered by PSI under the authority of the Nevada State Contractors Board (NSCB), evaluates prospective contractors on mechanical codes, refrigeration theory, electrical requirements, load calculations, environmental safety regulations, and trade-specific laws. Under Nevada Administrative Code (NAC 624.380), the C-21B classification authorizes licensed contractors to install, service, and repair systems that utilize evaporation, refrigeration, boilers, or combustion to control indoor air temperature and humidity in structures. Candidates must demonstrate technical competency in the Uniform Mechanical Code (UMC), National Electrical Code (NEC Article 440), ACCA Manuals (J, D, S, and N), EPA Section 608 compliance, and Nevada statutory contracting mandates. The Nevada Mechanical Codes, Contractor Law, and Safety Regulations domain evaluates statutory requirements and structural installation mandates governed by NAC Chapter 624, Nevada Revised Statutes (NRS 624), the Uniform Mechanical Code (UMC), and federal OSHA standards. Under Nevada law, a C-21B contractor executing residential contracts exceeding $1,000 must provide a formal written contract detailing the scope of work, exact payment schedule, license number, and statutory consumer protection disclosures; verbal agreements or waivers for work over $1,000 are strictly non-compliant. Any subsequent modification to the scope or cost requires a written change order signed by both parties prior to performing the additional work. Physical installation clearances under the UMC mandate a minimum of 30 inches of unobstructed working space in front of the control side of heating and cooling appliances to ensure safe servicing access. Mechanical code rules also require refrigerant piping to be protected against corrosion and mechanical damage. Under OSHA (29 CFR 1926) and EPA Section 608 mandates, technicians must strictly avoid venting any fluorinated or substitute refrigerants (such as R-410A) during repair, utilizing certified recovery equipment and DOT-approved storage cylinders. The Refrigeration Cycle Thermodynamics, System Components, and Diagnostics domain measures mastery of heat transfer mechanisms, pressure-temperature relationships, and troubleshooting procedures. Mechanical cooling operates on the primary phase-change principles of sensible heat (which changes temperature without altering phase) and latent heat (which changes physical phase at a constant temperature). The compressor draws low-pressure, low-temperature vapor from the evaporator and compresses it into high-pressure, high-temperature vapor. Placing a liquid line filter-drier directly upstream of the expansion valve protects the metering orifice from moisture and particulate contaminants. In long vertical piping runs exceeding 20 feet, double suction risers or specific oil traps are required to ensure continuous compressor oil return under reduced load conditions. When pulling a evacuation vacuum prior to charging, a micron gauge that stalls and plateaus around 1,500 microns indicates that residual moisture is boiling off inside the piping; a proper leak-free, dry system evacuation must pull down to and hold below 500 microns. Diagnostic evaluations rely on precise superheat and subcooling measurements: low suction pressure combined with high superheat and normal subcooling points to an undercharged system or suction line restriction, whereas a restricted liquid line filter-drier produces elevated head pressure with low suction pressure. To prevent liquid refrigerant migration into compressor crankcase oil during off-cycles in desert climates, crankcase heaters must maintain elevated oil temperatures. The Load Calculations, Air Distribution, and Electrical Control Integration domain covers ACCA design standards, duct sizing, ventilation requirements, and electrical branch circuit sizing. Cooling load calculations using ACCA Manual J establish accurate building heat gain, while ACCA Manual D governs duct system design based on friction loss and airflow volume. Standard residential air-cooled split systems require approximately 400 cubic feet per minute (CFM) of airflow per ton of cooling capacity (e.g., a 5-ton system requires 2,000 CFM). Air duct velocity limits mandate precise sizing calculations; for example, delivering 1,200 CFM at a maximum duct velocity of 900 feet per minute (FPM) requires a minimum duct cross-sectional area of 1.33 square feet ($text{Area} = text{CFM} / text{FPM}$). In hot, dry climates, demand-controlled ventilation (DCV) utilizing $text{CO}_2$ sensors modulates outdoor air intake based on real-time occupancy, significantly reducing mechanical cooling loads. Under NEC Article 440 guidelines, branch-circuit conductors supplying hermetic motor-compressors must be sized to carry at least 125% of the rated-load current or match the minimum circuit ampacity (MCA) listed on the equipment nameplate. Furthermore, a local disconnect switch must be located within sight of and readily accessible from the air conditioning equipment to ensure safe isolation during maintenance. Representative practice examination questions and verified solutions illustrate the core legal, thermodynamic, code, and operational concepts evaluated on the Nevada C-21B assessment:Question 1: Under Nevada Administrative Code (NAC 624.380), what specific methods is a licensed C-21B Air Conditioning Contractor authorized to utilize for controlling indoor air temperatures within structures?Answer: Evaporation, refrigeration, boilers, or combustion. (Rationale: NAC 624.380 explicitly defines the C-21B classification scope to include equipment utilizing evaporation, mechanical refrigeration, boilers, or fuel combustion to control air temperature and humidity). Question 2: According to Nevada contract law (NRS 624), what is the legal requirement for a licensed C-21B contractor executing a residential HVAC installation project where the total contract price exceeds $1,000?Answer: The contractor must provide a executed written contract detailing the scope of work, total price, payment schedule, and statutory contractor disclosures prior to initiating work. (Rationale: NRS 624 mandates written contracts for residential improvements exceeding $1,000; oral agreements and waivers do not comply with state licensing law). Question 3: During a system evacuation on a newly installed R-410A split system, the technician pulls a vacuum, but the micron gauge stalls at 1,500 microns and fails to drop further. What does this gauge behavior indicate?Answer: Moisture is still present within the system and is boiling off under the deep vacuum. (Rationale: A evacuation that stalls between 1,000 and 2,000 microns indicates that liquid water is vaporizing under reduced pressure; system evacuation must continue until the pressure drops and holds at or below 500 microns). Question 4: A 3-ton residential central air conditioning system operating in Nevada requires how much total airflow (CFM) across the evaporator coil under standard design conditions?Answer: 1,200 CFM. (Rationale: Standard cooling design airflow is calculated at 400 CFM per ton of refrigeration; 3 tons $times$ 400 CFM/ton = 1,200 CFM). Question 5: Under National Electrical Code (NEC) Article 440, what is the minimum required conductor ampacity for a branch circuit supplying an air conditioning unit with a nameplate rated-load current of 20 amperes?Answer: 25 amperes. (Rationale: NEC 440.32 mandates that branch-circuit conductors supplying a hermetic refrigerant motor-compressor must have an ampacity of not less than 125% of the rated-load current; 20 A $times$ 1.25 = 25 A). Question 6: Under the Uniform Mechanical Code (UMC), what is the minimum clear working space required in front of the servicing and control side of a warm-air furnace or air handling unit installed inside a mechanical room?Answer: 30 inches. (Rationale: The UMC requires a minimum unobstructed working clearance of 30 inches in front of the control and service access side of heating and cooling appliances to permit safe inspection and maintenance).

Vista previa del contenido

Page 1 of 109



Nevada C-21B Refrigeration and Air
Conditioning Contractor Exam
QUESTIONS AND CORRECT ANSWERS
LATEST UPDATE THIS YEAR



Nevada C-21B Refrigeration and Air Conditioning Contractor Exam
QUESTIONS AND CORRECT ANSWERS WITH DETAILED RATIONALES

The Nevada C-21B Refrigeration and Air Conditioning Contractor exam
does not have an officially published question bank. The exam is
administered by PSI on behalf of the Nevada State Contractors Board
(NSCB), and candidates are explicitly prohibited from reproducing or
transmitting test content; violations may result in disqualification and
legal action.

The following 250 original scenario-based practice questions are
compiled from the code references and topic areas cited in those
commercial study guides—2018 Uniform Mechanical Code (UMC), EPA

, Page 2 of 109


Section 608, Manual J/S/D, OSHA, and Nevada contractor law—for
study reference only .

Exam Context (from commercial prep providers): The C-21B trade
exam is a timed, open-book test administered by PSI. One prep provider
describes it as approximately 60 questions with a 180-minute limit . The
content domains cited include: General Knowledge & Safety (25%),
Systems & Equipment (25%), Piping & Refrigerants (20%), Load
Calculations (15%), and Controls (15%) .



250 Randomized Scenario-Based Practice Questions

1. A C-21B contractor is preparing to install a new split-system air
conditioner in a commercial building in Clark County. Before beginning
work, which action is required?
A. Notify the Nevada State Contractors Board in writing 30 days in
advance
B. Pull the required permits from the local building department
C. Obtain a separate refrigeration license for the refrigerant circuit
D. Hire a licensed professional engineer to supervise the entire
installation

Answer: B
Rationale: Before beginning regulated HVAC work, the C-21B licensee

, Page 3 of 109


must pull required permits from the local building department to ensure
inspection for code compliance and safety .

2. Under the 2018 Uniform Mechanical Code, what is the minimum
required slope for a horizontal condensate waste pipe from a cooling
coil?
A. 1/8 inch per foot toward the point of disposal
B. 1/2 inch per foot toward the air handler
C. Level is acceptable if the pipe is 1 inch or larger
D. 1/4 inch per foot toward the refrigerant suction line

Answer: A
Rationale: UMC 2018 Section 310.1 requires condensate waste piping to
slope not less than 1/8 inch per foot (1 percent) toward the point of
disposal .

3. Where overflow from a cooling-coil drain pan would damage the
building, UMC 2018 requires which additional protection?
A. A larger primary drain only, with no secondary device
B. A plugged overflow opening so the pan can hold more water
C. A secondary drain, an auxiliary pan with its own drain, or a water-
level device that shuts the equipment off
D. A hose from the pan to the roof scupper

, Page 4 of 109


Answer: C
Rationale: UMC 2018 Section 310.2 requires overflow protection
whenever a clogged primary drain would damage the structure.
Acceptable methods are an auxiliary pan with a separate drain, a
secondary drain connection, or a water-level detection device that de-
energizes the equipment .

4. A Las Vegas packaged rooftop unit is rated at 36 tons of
refrigeration. Using UMC 2018 Table 310.3, what is the minimum
condensate waste-pipe size?
A. 3/4 inch
B. 1 inch
C. 1-1/4 inches
D. 2 inches

Answer: B
Rationale: Thirty-six tons falls in the 21–40 ton row of Table 310.3,
which requires a 1-inch condensate waste pipe .

5. New ACR copper refrigerant piping must be pressure-tested for
leaks using which test medium?
A. Compressed oxygen from a cutting-torch cylinder
B. The system refrigerant, introduced until gauges reach 400 psig

Información del documento

Subido en
27 de octubre de 2026
Número de páginas
109
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$25.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
derejj
3.2
(5)
Vendido
25
Seguidores
0
Artículos
1403
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes