• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 51 páginas
Examen

Sap Ts410 Comprehensive Exam Study Guide With Complete Solutions

Document preview thumbnail
Vista previa 4 fuera de 51 páginas

Sap Ts410 Comprehensive Exam Study Guide With Complete Solutions

Vista previa del contenido

SAP TS410 COMPREHENSIVE EXAM STUDY
GUIDE WITH COMPLETE SOLUTIONS

●● What is the purpose of Material Ledger?
Answer: -the elimination of locking and increase throughput for standard
pricing for material valuation
-improved and flexible valuation methods in multiple currencies and
parallel accounting


●● What is the output of an MRP run?
Answer: -Planned Order
-Purchase Req for Dependent Requirements
-Reservation for Dependent Items


●● What is the master data need for Adv. Planning?
Answer: - Location
- Product
- Resource


●● List the Options for Running MRP?
Answer: - Total Planning
- Single Item Planning Multilevel

,- Single Item Planning Single Level
- Single Item Planning Interactive


●● What is the difference between the stock requirements list and the
MRP list?
Answer: Stock Req - Real Time / Dynamic
MRP List - Static / Frozen


●● What is the difference between MRP and Consumption Based
Planning?
Answer: MRP - planned on requirements (future, current, forecast)
CBP - planning on historical data (historical)


●● What does a work center control?
Answer: Standard Values
Scheduling
Capacity
Costing
Cost Center
Formulas
Activity Types


●● What is the result of a completion confirmation?

,Answer: - Progress of the order / status update
- GR partial or final
- Time Activity Update
- Scrap leftover material


●● What happens, on the Stock Requirements List, when a planned
order is converted to a production order for the finished product:
Answer: - planned order converts to production order
- BOM + routing is copied from planned order to production order


●● What happens, on the Stock Requirements List, when a planned
order is converted to a production order for the components:
Answer: - reservations for dependent components


●● What is a standard cost estimate used for?
Answer: -Determine the sales price
- Update the standard price in material master
- Calculate the planned cost in a production order


●● What is a work center?
Answer: - type of time (days, hours)
- where
- who

, - identifies the resources
- formula calculations


●● Describe each of the different types of goods movements.
Answer: - GR
- GI
- Stock Transfer / Transfer Posting


●● What is a routing?
Answer: Sequence of steps to complete the work
Quantity of time to complete the work


●● What transactions debit a production order?
Answer: GI
Confirmation
External Processing
Overhead
Direct FI Postings


●● What transactions credit a production order?
Answer: GR
Settlement

Información del documento

Subido en
25 de octubre de 2026
Número de páginas
51
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$16.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Vendido
36
Seguidores
1
Artículos
24252
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes