Control Scope - correct answersThe process of monitoring the status of the project and product scope and managing changes to the scope baseline. Requirements Documentation - correct answersdecribes how individual requirements meet the business need for the project Requirements Traceability Matrix - correct answersIs a grid that links the product from their origin to the deliverable s that satisfies them Project Scope Statement - correct answersis the description of the project scope, major deliverable s, assumptions, and constraints. product scope description - correct answersProgressively elaborates the characteristics of the product, service, or result described in the project charter and requirements doc. acceptance criteria - correct answersset of conditions that must be met before deliverable are accepted Deliverable - correct answersAn unique and verifiable product , result or capability to perform a service that is required to be produced to complete a process, phase or project Project Exculsion - correct answersWhat is excluded from the project, what is out of scope, helps manage the stakeholders. Decomposition - correct answersis a technique used for dividing and subdividing the project scope and project deliverable into smaller, more manageable parts. Scope baseline - correct answersapproved version of the scope statement , WBS and its associated WBS dictionary WBS - correct answersdecomposition of the total scope to be carried out by the project Validate Scope - correct answersis the process of formalizing acceptance of the completed project deliverables Variance analysis - correct answersis a technique for determining the cause and degree of difference between the baseline and actual performance. Plan Schedule Management - correct answersThe process of establishing the policies, procedures and documentation for planning, developing, managing, executing and controlling the project Define Activities - correct answersThe process of identifying and documenting the specific actions to be performed to produce the project deliverables Sequence Activities - correct answersThe process of identifying and documenting relationships among the project activities

Vista previa del contenido

CAPM EXAM PRACTICE TERMS 2026
Project - correct answersis a temporary endeavor undertaken to create a unique product, service or
result. Definite beginning and an end.

Project Management - correct answersis the application of knowledge, skills, tools and techniques to
project activities to meet the project requirements.

operations - correct answersOngoing, repetitive, for sustaining business. Responsible for overseeing,
directing and controlling business operations

Operational Stakeholders - correct answersShould be engaged and their needs identified.

Project Management Office - correct answersis a management structure that standardizes the project-
related governance processes and facilitates the sharing of resources, methodologies, tools and
techniques.

Supportive - correct answersConsultative role, supply templates, best practices, and training, access to
info. Serve as a respiratory, LOW control

Controlling - correct answersProvide support and require compliance, MODERATE control

Directive - correct answersdirectly manage project. HIGH control

Business Value - correct answersEntire value of the business, could be tangible or intangible.

Project Based Organization - correct answersRefers to the various organizational forms that create
temporary system for carrying out their work.

organizational Process assets - correct answersare the plans, process, procedures, and the knowledge
bases specific to and used by the performing organization

Enterprise Environmental Factors - correct answersrefers to the conditions, not under the control of the
project team, that influence, constraint, or direct the project.

Project Goverance - correct answersan oversight function, t

Progressive Elaboration
Progressive detailing,
iterative plan
Rolling wave planning - correct answersPlanning and documentations are iterative and ongoing
avctivites

initiating - correct answersThose processes performed to define a new project or a new phase of an
existing project by obtaining authorization to start the project or phase

, Planning - correct answersPerformed to establish the total scope of the effort, define and refine the
objectives and develop the course of action required to attain those objectives

Executing - correct answersPerformed to complete the work defined in the project management plan to
satisfy the project specification

Monitoring and Control - correct answersprocess required to track, review, and orchestrate the progress
and performance of the project, Identify any ares in which changes are required, and initiate the
corresponding changes

Closing - correct answersperformed to conclude all activities across all project areas requiring additional
attention

Work Performance Data - correct answersThe raw observations and measurements identified during
activities performed to carry out the project work

Work Performanc Information - correct answersThe performance data collected from various controlling
processes, analyzed in context and integrated based on relationships across areas.

Work performance reports - correct answersThe physical or electronic representation of work
performance information complied in project documents, intended to generate decisions to raise issues,
actions, or awareness.

The PMBOK represents the project management processes as - correct answersdiscrete elements with
well defined interfaces.

Project Charter - correct answersA document issued by the project initiator or sponsor that formally
authorizes the existence of a project or phase, and provides the project manager authority to apply
organizational resources to project activities"

Project Management Plan - correct answersis the document that describes how the project will be
executed, monitored, and controlled. Contains subsidiary plans concerning all aspects of the project

Plan Scope Management - correct answersThe process of creating a scope management plan that
documents how the project scope will be defined, validated and controlled.

Collect Requirements - correct answersThe process of determining, documenting and managing
stakeholder needs and requirements to meet the project objectives.

Define Scope - correct answersThe process of developing a detailed description of the project and
product. It describes the project, service, or result boundaries by defining which of the requirements
collected will be included and excluded from the project scope.

Create WBS - correct answersThe process of subdividing the project deliverables and project work into
smaller, more manageable components.

Validate Scope - correct answersThe process of formalizing acceptance of the completed project
deliverable.

Información del documento

Subido en
21 de octubre de 2026
Número de páginas
7
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$7.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
0
Artículos
176
Última venta
-



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes