• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 148 páginas
Examen

Virginia Class A Contractor Exam Original Practice Questions Study Guide

Document preview thumbnail
Vista previa 4 fuera de 148 páginas

Pass your licensing assessment on the first attempt with this comprehensive study resource containing original practice questions modeled after the official state exam. This targeted preparation pack thoroughly covers critical state regulations, statutes, risk management, bidding, and contract practices specific to the Commonwealth of Virginia. Designed for professionals and tradespeople seeking their top-tier credential, these practice sets ensure you master business law, safety guidelines, and board rules to confidently pass your exam and scale your contracting business.

Vista previa del contenido

Virginia Class A Contractor Exam
Original Practice Questions 2 versions


1. A contractor is reviewing contract documents for a commercial
project. Which document typically defines the scope of work, contract
sum, and time for completion?

A. The project manual

B. The agreement between owner and contractor

C. The general conditions

D. The technical specifications

B. The agreement between owner and contractor

The agreement (contract) is the primary document that defines the scope of
work, contract sum, time for completion, and the respective rights and
obligations of the parties. The project manual contains the bidding
documents, general conditions, and specifications, but the agreement itself is
the binding contract.




2. Which type of contract places the greatest risk on the contractor for
cost overruns?

A. Cost-plus-fee contract

B. Unit price contract

,C. Lump sum (fixed price) contract

D. Time and materials contract

C. Lump sum (fixed price) contract

In a lump sum contract, the contractor agrees to complete the work for a
fixed price regardless of actual costs. If costs exceed the contract sum, the
contractor absorbs the loss. Cost-plus and time-and-materials contracts pass
cost risk to the owner.




3. A contractor discovers that the plans and specifications contain a
discrepancy between the drawings and the written specifications.
What is the correct course of action?

A. Proceed with the less expensive option

B. Request clarification from the architect/engineer before proceeding

C. Proceed with the drawings since they take precedence

D. Proceed with the specifications since they take precedence

B. Request clarification from the architect/engineer before proceeding

When a discrepancy exists, the contractor should request clarification through
a formal Request for Information (RFI). Proceeding without clarification may
result in performing work that does not comply with the contract documents.




4. In construction estimating, what is the purpose of a quantity
takeoff?

A. To calculate the total contract price

,B. To determine the quantities of materials and labor required for each
work item

C. To establish the project schedule

D. To determine the contractor's overhead and profit

B. To determine the quantities of materials and labor required for each
work item

A quantity takeoff is the process of measuring and listing the quantities of
materials, labor, and equipment required for each component of the work. It
forms the basis for pricing the estimate.




5. What is the difference between direct costs and indirect costs in a
construction estimate?

A. Direct costs are labor and materials; indirect costs are overhead and
profit

B. Direct costs are overhead; indirect costs are materials

C. Direct costs are profit; indirect costs are labor

D. There is no difference

A. Direct costs are labor and materials; indirect costs are overhead and
profit

Direct costs are those directly attributable to the work, such as labor,
materials, and equipment. Indirect costs (also called overhead) include
general conditions, home office overhead, and profit.

, 6. Which of the following is considered a general condition cost in a
construction estimate?

A. Concrete materials

B. Temporary power and site supervision

C. Structural steel

D. Roofing labor

B. Temporary power and site supervision

General conditions (also called general requirements) include project
management, temporary facilities, site supervision, temporary power and
water, and other costs required to support the work but not part of the
permanent construction.




7. What is the purpose of a contingency in a construction estimate?

A. To cover the contractor's profit

B. To cover unforeseen conditions or changes in scope

C. To pay for subcontractor markups

D. To cover the cost of permits

B. To cover unforeseen conditions or changes in scope

A contingency is an allowance included in the estimate to cover unexpected
conditions, minor changes, or price escalation. It is not a profit center but a
risk management tool.

Información del documento

Subido en
16 de octubre de 2026
Número de páginas
148
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$33.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CornelWest
3.7
(267)
Vendido
1663
Seguidores
1131
Artículos
13726
Última venta
7 horas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes