Examen

CSLB B LICENSE GENERAL CONTRACTOR EXAM Questions and Answers Updated 2026/2027 Version | Verified Answers

Document preview thumbnail
Vista previa 4 fuera de 53 páginas

CSLB B LICENSE GENERAL CONTRACTOR EXAM Questions and Answers Updated 2026/2027 Version | Verified Answers 1. In a commercial or publicly funded building, which is required when a handicap sink is open underneath? A. Surface no higher than 34" B. Knee clearance of at least 30" C. No sharp edges underneath D. All of the above - ANSWER All of the above. For a publicly funder or commercial building a handicap sink is required to have a surface no higher than 34", knee clearance of at least 30", and no sharp edges. 2. Which of the following is a non-flammable adhesive? A. Release-type adhesive B. Alcohol-type adhesive C. Contact-type adhesive D. Padding cement - ANSWER Release-type adhesive is non flammable. 3. A stairway's maximum total riser and tread dimension would be: A. 1 riser + 2 treads = 22" B. 2 risers + 1 tread = 25" C. 2 treads + 1 riser = 25" D. Dependent on customer's request - ANSWER 2 risers + 1 tread = 25" 4. A curb and threshold are not necessary in a shower: A. Where children use it B. For drain water C. When designed for wheel chair use D. Curbs and thresholds are always required - ANSWER A curb and threshold is not required when designed for wheel chair use. 5. If the elevation of point A is 92.6', and the transit reading at point A is 3.4', then the elevation of the transit is: - ANSWER The elevation of the transit is 96'. 6. Which of the following need NOT be grounded? A. Receptacle B. Junction box C. Light fixture D. Thermostat - ANSWER A thermostat is low voltage and would not need to be grounded. 7. Which formula would you use to determine the quantity of drywall needed for a wall of a room? A. Ceiling height + wall length B. Ceiling height - wall length C. Ceiling height x wall length D. Ceiling height ÷ wall length - ANSWER Ceiling height x wall length. 8. When would you use a stepped foundation? - ANSWER A stepped foundation would be used on a hillside or slope. 9. Of the following, which method is best for attaching residential floor tile to particle-board sub flooring? A. 1/4" staples B. Powder-actuated nailer C. 12d nails D. Adhesive - ANSWER Adhesive would be the best method for attaching particle-board sub flooring to resident floor tile. 10. Handicap grab bars should be installed with: A. Brackets and nails B. Brackets and super glue C. Brackets and screws D. Brackets and anchor bolts - ANSWER Handicap grab bars should be installed with brackets and screws. 11. Of the following which is the most dangerous effect of air bubbles in mortar? A. Interrupts consistency of mortar B. Weakens mortar strength C. Changes texture D. Changes the chemical composition - ANSWER Air bubbles in mortar will weaken the strength. 12. What is required to be installed between the cold water supply and a water heater? - ANSWER A shut off valve is required to be installed between the cold water supply and the hot water heater. 13. The total of 1' 10-1/2" and 8-3/4" is: - ANSWER 2' 7 1/4" 14. The maximum allowable distance between a wall and a suspended masons scaffold is? - ANSWER 6" is the maximum allowable distance between a wall and a suspended masons scaffold. 15. When would a basement be included in the total allowable area calculation for a building? - ANSWER The basement of a building will sometimes be included in the total allowable area calculation. 16. What should you do after discovering asbestos on a job? - ANSWER Contact the Chief of DOSH 17. The maximum allowable distance between a wall and heavy trades wooden pole scaffolding is: - ANSWER 14" is the maximum allowable distance between a wall and heavy wooden pole scaffolding. 18. When must the contractor provide the warranty for a water heater to the property owner? - ANSWER The contractor must provide the warranty for a water heater to the property owner on completion of installation at the job site.

Vista previa del contenido

CSLB B LICENSE GENERAL CONTRACTOR
EXAM Questions and Answers Updated
2026/2027 Version | Verified Answers


1. In a commercial or publicly funded building, which is required when a
handicap sink is open underneath?


A. Surface no higher than 34"
B. Knee clearance of at least 30"
C. No sharp edges underneath
D. All of the above - ANSWER ✅ All of the above.
For a publicly funder or commercial building a handicap sink is required to
have a surface no higher than 34", knee clearance of at least 30", and no
sharp edges.


2. Which of the following is a non-flammable adhesive?


A. Release-type adhesive
B. Alcohol-type adhesive
C. Contact-type adhesive
D. Padding cement - ANSWER ✅ Release-type adhesive is non-
flammable.


3. A stairway's maximum total riser and tread dimension would be:


A. 1 riser + 2 treads = 22"
B. 2 risers + 1 tread = 25"

, C. 2 treads + 1 riser = 25"
D. Dependent on customer's request - ANSWER ✅ 2 risers + 1 tread =
25"


4. A curb and threshold are not necessary in a shower:


A. Where children use it
B. For drain water
C. When designed for wheel chair use
D. Curbs and thresholds are always required - ANSWER ✅ A curb and
threshold is not required when designed for wheel chair use.


5. If the elevation of point A is 92.6', and the transit reading at point A is 3.4',
then the elevation of the transit is: - ANSWER ✅ The elevation of the
transit is 96'.


6. Which of the following need NOT be grounded?


A. Receptacle
B. Junction box
C. Light fixture
D. Thermostat - ANSWER ✅ A thermostat is low voltage and would not
need to be grounded.


7. Which formula would you use to determine the quantity of drywall needed
for a wall of a room?


A. Ceiling height + wall length
B. Ceiling height - wall length
C. Ceiling height x wall length

, D. Ceiling height ÷ wall length - ANSWER ✅ Ceiling height x wall
length.


8. When would you use a stepped foundation? - ANSWER ✅ A stepped
foundation would be used on a hillside or slope.


9. Of the following, which method is best for attaching residential floor tile to
particle-board sub flooring?


A. 1/4" staples
B. Powder-actuated nailer
C. 12d nails
D. Adhesive - ANSWER ✅ Adhesive would be the best method for
attaching particle-board sub flooring to resident floor tile.


10.Handicap grab bars should be installed with:


A. Brackets and nails
B. Brackets and super glue
C. Brackets and screws
D. Brackets and anchor bolts - ANSWER ✅ Handicap grab bars should
be installed with brackets and screws.


11.Of the following which is the most dangerous effect of air bubbles in
mortar?


A. Interrupts consistency of mortar
B. Weakens mortar strength
C. Changes texture

, D. Changes the chemical composition - ANSWER ✅ Air bubbles in
mortar will weaken the strength.


12.What is required to be installed between the cold water supply and a water
heater? - ANSWER ✅ A shut off valve is required to be installed between
the cold water supply and the hot water heater.


13.The total of 1' 10-1/2" and 8-3/4" is: - ANSWER ✅ 2' 7 1/4"


14.The maximum allowable distance between a wall and a suspended masons
scaffold is? - ANSWER ✅ 6" is the maximum allowable distance between a
wall and a suspended masons scaffold.


15.When would a basement be included in the total allowable area calculation
for a building? - ANSWER ✅ The basement of a building will sometimes
be included in the total allowable area calculation.


16.What should you do after discovering asbestos on a job? - ANSWER ✅
Contact the Chief of DOSH


17.The maximum allowable distance between a wall and heavy trades wooden
pole scaffolding is: - ANSWER ✅ 14" is the maximum allowable distance
between a wall and heavy wooden pole scaffolding.


18.When must the contractor provide the warranty for a water heater to the
property owner? - ANSWER ✅ The contractor must provide the warranty
for a water heater to the property owner on completion of installation at the
job site.

Información del documento

Subido en
15 de octubre de 2026
Número de páginas
53
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
DrMwendwa
2.0
(2)
Vendido
4
Seguidores
0
Artículos
556
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes