• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 28 páginas
Examen

Dbia Exam With Review Questions And Correct Answers

Document preview thumbnail
Vista previa 3 fuera de 28 páginas

Dbia Exam With Review Questions And Correct Answers

Vista previa del contenido

1


DBIA EXAM WITH REVIEW QUESTIONS AND CORRECT
VERIFIED ANSWERS/ DBIA EXAM – DESIGN BUILD QS & AS
2026-27 LATEST VERSION


prior to bidding, owner undertakes a process to design the project
and all of its details to 100% complete plans and specs. the owner is
therefore responsible for success or failure of details of the design,
and warrants the sufficiency of design to the contractor. the owner is
therefore liable to the contractor for any gaps between plans and
specifications and owner's requirements for project performance -
ANSWER-design bid build paradigm


the owner should define its performance requirements and award
the contract on the basis of preliminary design; this makes the
design-builder responsible for completing the design in accordance
with the owner's performance
requirements. that also causes the design-builder to warrant the
sufficiency of the design to meet the owner's criteria and the
sufficiency of the design to subcontractors/suppliers that have no
design responsibility - ANSWER-design details responsibility


subdivides project by functional elements, focuses on systems and
assemblies, useful for preliminary information and early design
phases, aligns with BIM models and conceptual estimating -
ANSWER-uniformat


subdivides work by results/trades, focuses on building materials,
products, and activities, useful for detailed information during final
design and construction phases, and aligns with detailed estimating -
ANSWER-masterformat

,2


a specific business need or behavior as seen by an external user of the
system; describe what functions/operations the end product must
perform/accommodate; examples: regulatory, permitting, economic,
and
others that define functions and operational capability. "Build an
office building on my existing lot to provide office space for 1,000
workers" - ANSWER-
functional requirement


describes what product(s) components must do/achieve with a
measurement metric; challenges: developing objective and definable
standards to validate performance, tendency to drift to prescriptive
specs; examples: uniformat C10, interior construction. "Provide
durable, paintable interior walls between the
offices with STC 35 (min)" - ANSWER-performance requirement


describes in terms of exactly how the product and/or its components
must be built; cookbook approach; developed by the design builder
but used by owners in the RFP/bridging documents for operability or
maintenance needs and conditions of permits or third parties;
examples: uniformat C10, partitions.
"Install gypsum wallboard on 3-5/8" metal studs at 16" on center with
XX
acoustical insulation per YY standards." - ANSWER-prescriptive
requirement


takes the best of "qualified" teams; a key to design-build success; not
the same as prequalifying or pass/fail; keeping this small increases
interest among the best teams and minimizes procurement costs for
everyone including the owner
- ANSWER-shortlisting


owners define their goals and selection criteria, one or 2 phase

, 3


process if shortlisting is applicable, price is not a factor in
selection, award to most qualified proposer, negotiate to a fair
and reasonable price - ANSWER-competitive procurement
process


qualifications, experience and past performance of design build
team, qualifications of key personnel, capacity of design build team
to perform work, team experience in working together, deisgn-
builder's project management

Información del documento

Subido en
15 de octubre de 2026
Número de páginas
28
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$30.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
SuperMARIO11
1.0
(1)
Vendido
2
Seguidores
0
Artículos
536
Última venta
5 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes