NHIE UPDATED ACTUAL QUESTIONS WITH CORRECT
ANSWERS

Question 1.
Buckling in a horizontal vinyl siding is generally caused by
A. reflected light
B. improper fastening
C. condensation in the walls
D. improper house wrap

ANSWER
B. improper fastening



Question 2.
At what level would water pressure within a single-family dwelling begin to be considered excessive
and require correction?
A. 60 psi
B. 80 psi
C. 100 psi
D. 120 psi

ANSWER
B. 80 psi



Question 3.
A newer home with electric heat is being inspected. It has a below grade finished basement containing
a bedroom. The inspector should look for a smoke alarm and
A. an escape and rescue opening
B. a carbon monoxide alarm
C. a fire extinguisher
D. a safety ladder

ANSWER
A. an escape and rescue opening






,Question 4.
A swimming pool fence must prevent passage of a sphere that is larger than
A. 2 inches
B. 3 inches
C. 4 inches
D. 5 inches

ANSWER
C. 4 inches



Question 5.
5. Refer to the photograph to answer this question What should an inspector recommend to the client
regarding the conditions shown in relation to the downspout/rain leader?
A. Nothing, the downspout is properly installed
B. Gravel should be installed under the downspout
C. The downspout should be moved away from the siding
D. A contractor should evaluate the downspout and recommend repairs

ANSWER
D. A contractor should evaluate the downspout and recommend repairs




Question 6.
If water infiltration is suspected behind a finished surface. What tool would be the best choice to verify
dampness?
A. an infrared thermometer
B. a pin-type moisture meter
C. a non-contact moisture meter
D. a digital camera

ANSWER
C. a non-contact moisture meter






,Question 7.
Gas fired furnace heat exchangers most often fail from
A. low temperatures
B. lack of use
C. improper gas pressure
D. rust and metal fatigue

ANSWER
D. rust and metal fatigue



Question 8.
Relative Humidity (RH) is expressed as
A. volume
B. percentage
C. capacity
D. temperature

ANSWER
B. percentage



Question 9.
Connections of dissimilar metal in a plumbing system, such as galvanized steel pipe and copper pipe,
will usually cause
A. reduced water pressure
B. decreased water quality
C. glazed pipes
D. electrolysis

ANSWER
D. electrolysis



Question 10.
A Ground fault circuit interrupter (GFCI) is a safety device that
A. disconnects power when the ground to the outlet is faulty
B. detects moisture and disconnects power in wet locations
C. disconnects the power when sensing current leakage to the ground
D. protects against electrical surges and voltage spikes

ANSWER
C. disconnects the pow-
er when sensing current leakage to the ground






, Question 11.
An electrical system with a fuse on the neutral conductor and on the energized (hot) conductors
A. is twice as safe as a system where only the energized (hot) conductors are fused
B. should have the neutral conductor fuse sized to one half the normal ampacity for the circuit
C. is overused up to 50% if used only for lighting
D. is hazardous and should be corrected

ANSWER
D. is hazardous and should be corrected



Question 12.
To operate a central air conditioner, an electric clothes dryer, and an electric range, the ampacity of the
service to the house has to be AT LEAST
A. 100 amps at 120 volts
B. 125 amps at 120 volts
C. 60 amps at 240 volts
D. 100 amps at 240 volts

ANSWER
D. 100 amps at 240 volts



Question 13.
A floor joist in a crawl space has been cut where the toilet drain passes through the floor. The joists are
2x6 spaced at 16" on center. The inspector should recommend that
A. the buyer monitor the floor. Floor systems such as this have redundant framing and removal of one
joist is insignificant
B. a contractor should support the cut joist with new piers and posts from below
C. the cut joist should be headed off to adjacent framing members to distribute the load
D. a contractor be contacted to determine with is needed and make repairs

ANSWER
D. a contractor be contacted to determine with is needed and make repairs

Información del documento

Subido en
12 de octubre de 2026
Número de páginas
57
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$17.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
FocusFile7
4.0
(29)
Vendido
299
Seguidores
4
Artículos
76015
Última venta
10 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes