LEED AP ID+C EXAM QUESTION BANK
2025/2026 ACTUAL EXAM QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED
ANSWERS) ALL ANSWERED {300 Q & A}
ALREADY GRADED A+ | BRAND NEW! |
(CURRENTLY TESTING)
A project that originally registered as one tenant space has
undergone a change and now has two different tenants. Which
action should be taken to determine if the space can remain a
single project?
A. Submit a project CIR
B. Submit the issue via the feedback button within leedonline.com
C. Submit a LEED interpretation
D. Contact LEED technical customer service - ✔✔✔ Correct Answer >
D. Contact LEED technical customer service
This path is meant to provide assistance with existing LEED
guidance or processes.
When a 'local equivalent' is specified as an alternative to a LEED
referenced standard for a project's locality, to be acceptable the
local equivalent: (pick 2)
,2|Page
A. Must meet the credit's intent leading to similar or better
outcomes
B. Must perform at least 10% better than the U.S. standard
C. Must use measurements in International System of Units (SI)
D. Must be widely used and accepted by industry experts - ✔✔✔
Correct Answer > A. Must meet the credit's intent leading to similar
or better outcomes
D. Must be widely used and accepted by industry experts
A project team wants to claim water reductions for an
incomplete space for an office project. If a future tenant is
responsible for completing the space what documentation must
be submitted for the project to claim environmental performance
beyond the baseline? (pick 2)
A. A brief explanation of the project circumstances
B. An unsigned lease agreement
C. Sample lease agreement
D. Binding tenant sales and lease agreement for the incomplete
space - ✔✔✔ Correct Answer > A. A brief explanation of the project
circumstances
This is required when tenants will be finishing incomplete
spaces.
,3|Page
D. Binding tenant sales and lease agreement for the incomplete
space
A binding agreement is required when credit is trying to be
earned.
Which of the following instructional initiatives would satisfy the
requirements of an education program for innovation for IN
Credit Innovation? (pick 3)
A. Weekly guided tours about sustainability using the project as
an example
B. An education program open to the public held once after the
project is completed
C. Comprehensive signage program throughout the project to
educate occupants about the benefits of sustainable buildings
D. A newsletter sent out at project completion announcing the
project
E. Case study highlighting the successes of the LEED ID+C
project that could be used for other building projects - ✔✔✔ Correct
Answer > A. Weekly guided tours about sustainability using the
project as an example
C. Comprehensive signage program throughout the project to
educate occupants about the benefits of sustainable buildings
E. Case study highlighting the successes of the LEED ID+C
project that could be used for other building projects
, 4|Page
For an education program at least 2 initiatives must be included
and they must be ongoing.
Which part of the LEED development cycle is used for
streamlining the approach to particular needs, constraints, and
opportunities of different project types?
A. Recertification
B. Addenda
C. Adaptations
D. Interpretations - ✔✔✔ Correct Answer > C. Adaptations
The process of making adaptations to existing ratings systems
and their credits provides an efficient and streamlined approach
for responding to the particular needs, constraints, and
opportunities of different project types.
Which design decisions can earn a project IN Credit Innovation
for exemplary performance? (pick 2)
A. Purchasing 95% of products that are extracted, manufactured,
and purchased within 100 miles (160 kilometers) of the project
B. A long-term tenant committment of 10 years
C. Sourcing at least 40 products with EPDs from 5 different
manufacturers
D. Purchasing 50%, by cost, of the total value of permanently
installed building products meet the responsible extraction