GCSS ARMY TDA UPDATED EXAM
QUESTIONS AND CORRECT ANSWERS
●● Plant 2001
Answer: GCSS-Army SSA and above funds stratification
[AWCF]
●● Authorized to Forecast
Answer: The GCSS-Army Demand Analysis process which recommends
additions to and deletions from the Authorized Stockage List (ASL).
[Demand Analysis/Enhanced Dollar cost Banding]
●● Consumption
Answer: Quantity of items consumed per requirement.
[Demand]
●● Consumtion Base Planning
Answer: The concept of basing your planning on consumption rather
than demands.
, [No legacy term]
●● Forecasting
Answer: The GCSS-Army process that leverages consumption history to
calculate supply requirements for a period of 12 months into the future.
Forecasting occurs when historical consumption data exists for the
material and location. Forecasting is typically run by MRP Area.
[Requisitioning Objective]
●● Maintenance Significant Part (MSP)
Answer: A critical, repairable, and typically high dollar readiness driver.
[Readiness Driver]
●● Overdue Deliveries
Answer: Pseudo Receipt Process
[Pseudo Receipt]
●● Planned Delivery Time (PDT)
QUESTIONS AND CORRECT ANSWERS
●● Plant 2001
Answer: GCSS-Army SSA and above funds stratification
[AWCF]
●● Authorized to Forecast
Answer: The GCSS-Army Demand Analysis process which recommends
additions to and deletions from the Authorized Stockage List (ASL).
[Demand Analysis/Enhanced Dollar cost Banding]
●● Consumption
Answer: Quantity of items consumed per requirement.
[Demand]
●● Consumtion Base Planning
Answer: The concept of basing your planning on consumption rather
than demands.
, [No legacy term]
●● Forecasting
Answer: The GCSS-Army process that leverages consumption history to
calculate supply requirements for a period of 12 months into the future.
Forecasting occurs when historical consumption data exists for the
material and location. Forecasting is typically run by MRP Area.
[Requisitioning Objective]
●● Maintenance Significant Part (MSP)
Answer: A critical, repairable, and typically high dollar readiness driver.
[Readiness Driver]
●● Overdue Deliveries
Answer: Pseudo Receipt Process
[Pseudo Receipt]
●● Planned Delivery Time (PDT)