◉ 2. The ERP structure in GCSS-Army uses combinations of
organizational elements to represent SSAs and Units. The
____________ is a designated virtual area within each plant where
planning occurs for an activity.
Answer: b. MRP area
◉ 3. The physical slot where material resides in Plant 2001 is
known as the _________.
Answer: d. Bin
◉ 4. The Advance Shipment Notification (ASN) triggers the
creation of a (an) ____________.
Answer: b. inbound delivery
◉ 5. Which source and destination listed below represents a
goods receipt going to the warehouse for putaway?
Answer: c. 902 500000XXXX to RAK WACBA
◉ 6. Data from transportation or supply discrepancies is
automatically transferred to WEBSDR.
QUESTIONS AND CORRECT ANSWERS
EXAM SCRIPT
◉ 2. The ERP structure in GCSS-Army uses combinations of
organizational elements to represent SSAs and Units. The
____________ is a designated virtual area within each plant where
planning occurs for an activity.
Answer: b. MRP area
◉ 3. The physical slot where material resides in Plant 2001 is
known as the _________.
Answer: d. Bin
◉ 4. The Advance Shipment Notification (ASN) triggers the
creation of a (an) ____________.
Answer: b. inbound delivery
◉ 5. Which source and destination listed below represents a
goods receipt going to the warehouse for putaway?
Answer: c. 902 500000XXXX to RAK WACBA
◉ 6. Data from transportation or supply discrepancies is
automatically transferred to WEBSDR.