• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 64 páginas
Examen

Arizona A General Engineering | Exam Questions & Verified Answers PDF | Complete Exam Prep |

Document preview thumbnail
Vista previa 4 fuera de 64 páginas

Arizona A General Engineering exam preparation material is designed for candidates preparing for the Arizona A General Engineering contractor licensing examination. The A classification covers fixed works and major infrastructure such as roads, bridges, dams, utility plants, sewage and waste disposal plants, tunnels, and related public works, with applicants required to pass the applicable trade and Arizona statutes and rules examinations. Current Stuvia listings also feature Arizona A General Engineering contractor exam practice questions, verified answers, and rationales. This resource is suitable for Arizona A General Engineering exam questions, contractor exam prep, practice tests, licensing exam review, verified answers, and study material PDF for .

Vista previa del contenido

Arizona A General Engineering - Exam Questions & Verified Answers

What is the maximum amount of soil allowable over a 18 inches
seepage pit cover? 3 multiple choice options




What is the maximum allowable slope of a disposal line in Level
a leach field? 3 multiple choice options




What is the painted line on the face of the ductile iron pipe To determine if plain end has been properly positioned in the bell socket
used for?

To ensure correct bevel is placed on pipe
To determine if plain end has been properly positioned in
the bell socket
Alignment of pipes
To ensure pipe is round and not oval


The maximum projected area of a solar collector, through Aperture area
which the un concentrated solar radiating energy is
admitted is called?

Aperture area
Emittance area
Storage area
Plenum


What is the result of having a good pre-compacted sub- Increases paving seeds
grade?

Increases paving seeds
Easier to see what direction to pave
Doesn't allow workers footprints to affect paving
No advantage


In refer to concrete piles, when do you release the 3,500 psi
prestressing forces?

7,500 psi
When they reach design strength
5,000 psi
3,500 psi


Which of the following types of pipe can be used in a Stainless
water-glycol type of solar system?

Galvanized steel
Stainless
PEX
PVC


What does symbol "?" represent? Collector tilt

Collector tilt
Solar irradiance
Ohms
Wavelength


What is the process called that ensures a generator's Synchronization
output matches the utility's sine wave in voltage,
frequency, and phase before connecting to the grid?

Back-feeding
Synchonization
Mating
Generator loading




Stuvia 2026-2027 | Updated Edition

, Arizona A General Engineering - Exam Questions & Verified Answers
Which type of roller is best for hot asphalt? Smooth drum vibratory (steel wheel vibratory)

?
Smooth drum vibratory (steel wheel vibratory)
Smooth drum
Rubber tire


If the daily operating time for system loads is 14 hr/day C/70
over an autonomy of 4 days, and the allowable depth of
discharge is 80 percent, what is the average discharge
rate?

C/50
C/60
C/80
C/70


What admixture is best for deicing in moderate conditions? Air entrainment

Water reducer
Air entrainment
Calcium chloride
Superplasticizer


A _____ is used to connect the cold water line and the Mixing valve
solar hot water line where they meet, going to the house.

Sarco thermol connector
Bypass valve
Head valve
Mixing valve


How is a premises grounded conductor, larger than 6 White or gray finish
AWG, identified?

3 green stripes
White or gray finish
Green conductor
Black conductor


What is the system called when there is a PV Array, AC Generation
inverter, battery, DC disconnect and charge controller?

Solar Thermal Array
Battery Isolation Network
AC Generation
A Charge System


According to the Code, what minimum size septic tank is 1500 gallons
needed for a 5 bedroom house with a garbage disposal?

1200 gallons
1000 gallons
1500 gallons
2000 gallons


A transmission line with 2 or more conductors per phase Spacers
requires:

Dampers
Insulation
Spark arrestors
Spacers




Stuvia 2026-2027 | Updated Edition

, Arizona A General Engineering - Exam Questions & Verified Answers
The purpose of a Safety Monitor is primarily to: Monitor employees at risk of falling

Inspect job sites for Osha compliance
Train employees
Monitor progress of work
Monitor employees at risk of falling


On a Rural roadway going from a 2 way to a 1 way 1500 feet
condition, what minimum distance do you need to for
advance warning sign?

300 feet
1500 feet
500 feet
100 feet


The ADEQ has a Construction General Permit (CGP) for Develop a Stormwater Pollution Prevention Plan (SWPPP) and submit a
stormwater discharges for construction sites. In order to Notice of Intent (NOI) to the ADEQ
apply for coverage under this permit what must the
operator do?

Submit an application to the municipal sewer district for
service

Develop a Stormwater Pollution Prevention Plan and
submit it to the local building department

Develop a Stormwater Pollution Prevention Plan (SWPPP)
and submit a
Notice of Intent (NOI) to the ADEQ

Ask the subcontractors to develop a
Stormwater Pollution Prevention Plan


What type of valve is required at the high point of a drain Vacuum relief valve
down solar system?

Vacuum relief valve
One way valve
Check valve
Pressure relief valve


What identification is required on reinforcing bars? Mill, size, type of steel, and grade

Size, type of steep, and grade
Mill, size, and grade
Mill, size, type of steel, and grade
Mill, type of steel, and grade


Who is responsible for the onsite implementation of the The contractor
SWPPP and maintenance of Best Management Practice?

The owner
The EPA
The building inspector
The contactor


Where is a transmission station located? At or near a generating station

Remote location
A city
At or near a generating station
At electric utility company




Stuvia 2026-2027 | Updated Edition

, Arizona A General Engineering - Exam Questions & Verified Answers
What is the best method for correcting differential Pave in more, thinner layers
compaction?

Pave in more, thinner layers
Does not occur on existing pavement
Use a scoop dozer
Pave in fewer, thicker layers


That section of a solar system that includes the collector Collector system
and piping or ducts from the collector to the storage
system is called?

Offset
Collector cover
Fixture branch
Collector system


Supply cable of 75 kv (50,001 and above) shall have a 42 inches
burial depth (cover) of ___ ?

30 inches
42 inches
48 inches
24 inches


In what direction should a solar collector face for optimum South
exposure?

South
West
East
North


What is the minimum ground cover required for a 12 inch 24 inches
ductile iron pipe?

36 inches
24 inches
18 inches
12 inches


What is the minimum trench width when laying 12 inch 30 inches
concrete pipe?

24 inches
30 inches
16 inches
12 inches


How close can a septic disposal line be to a 12 inch water 10 feet
main?

5 feet
10 feet
50 feet
20 feet


What is the minimum vertical clearance when one gas 6 inches
pipeline is being laid over another?

2 inches
9 inches
6 inches
12 inches




Stuvia 2026-2027 | Updated Edition

Información del documento

Subido en
3 de octubre de 2026
Número de páginas
64
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Pacesetter111
4.4
(5)
Vendido
23
Seguidores
0
Artículos
1430
Última venta
4 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes