Ontario On-Site Sewage Systems Technical Exam Questions and Verified Answers with Rationales

Document preview thumbnail
Vista previa 4 fuera de 227 páginas

Ontario On-Site Sewage Systems Technical Exam Questions and Verified Answers with Rationales

Vista previa del contenido

Ontario On-Site Sewage Systems Technical
Exam Questions and Verified Answers with
Rationales
Question 1
What is the minimum soil depth between the high groundwater table and the bottom
of an earth pit privy?
Correct Answer
900 mm



Question 2
How do you calculate the daily design sanitary sewage flow for a residential
occupancy?
Correct Answer
From Table 8.2.1.3.A.



Question 3
Which of the following systems has a leaching bed as a way to dispose waste?
Correct Answer
Class 4 system



Question 4
Who must sign the application for a building permit for an on-site sanitary sewage
system?
Correct Answer
the owner of the property
the agent for the owner




Page 1 of 227

,Question 5
What is the range of percolation time allowed for a shallow buried trench system?
Correct Answer
Between 1 min/cm and 125 min/cm



Question 6
Who investigates complaints about malfunctioning systems?
Correct Answer
the inspector




Page 2 of 227

,Question 7
The regulations stipulate that hydraulic conductivity of the covering material must not
be:
Correct Answer
less than 0.01 m/day
Question 1: What is the minimum required capacity for a septic tank serving a
single-family dwelling with up to three bedrooms under the Ontario Building Code
Part 8?

A. 2,000 litres

B. 2,700 litres

C. 3,600 litres

D. 4,500 litres

CORRECT ANSWER: C. 3,600 litres

Rationale: Under the Ontario Building Code, the minimum capacity for a septic tank
serving a residential house with up to three bedrooms is 3,600 litres, with an
additional 900 litres required for each bedroom beyond three.

Question 2: According to the Ontario Building Code, what is the minimum vertical
separation distance required between the bottom of an absorption trench and the
high water table or rock?

A. 0.3 metres

B. 0.6 metres

C. 0.9 metres

D. 1.2 metres

CORRECT ANSWER: D. 1.2 metres

Rationale: A minimum unsaturated soil depth of 1.2 metres is required beneath an
absorption trench to ensure proper biological treatment and filtration of effluent
before it reaches the groundwater table or bedrock.

Question 3: Which of the following describes the primary purpose of a percolation
test (perc test) when designing an on-site sewage system?

A. To measure the chemical concentration of wastewater constituents

B. To determine the rate at which soil absorbs clear water to gauge permeability

C. To measure the exact depth of the bedrock layer across the entire property




Page 3 of 227

, D. To calculate the daily design sewage flow based on occupancy rates

CORRECT ANSWER: B. To determine the rate at which soil absorbs clear water to
gauge permeability

Rationale: A percolation test measures the percolation rate ($T$-time) of water in
the soil, which directly governs the sizing and design of leaching beds and
absorption trenches.

Question 4: What is the minimum horizontal distance required under the Ontario
Building Code between a septic tank and a property line?

A. 1.2 metres

B. 3.0 metres

C. 5.0 metres

D. 15.0 metres

CORRECT ANSWER: A. 1.2 metres

Rationale: The Ontario Building Code specifies a minimum horizontal separation of
1.2 metres between a septic tank and a property line to allow for maintenance
access and prevent boundary conflicts.

Question 5: When calculating daily design sewage flow for a private residence, how
much daily flow must be allocated for each bedroom after the first three bedrooms?

A. 500 litres per day

B. 750 litres per day

C. 900 litres per day

D. 1,000 litres per day

CORRECT ANSWER: A. 500 litres per day

Rationale: For single-family dwellings, the design flow is calculated based on
occupancy, requiring specific allowances for bedrooms. Specifically, each bedroom
after the first three adds 500 litres per day to the base flow calculation.

Question 6: What is the minimum horizontal separation distance required between
a distribution pipe in a leaching bed and a drilled well with a watertight casing?

A. 5 metres

B. 10 metres

C. 15 metres

D. 30 metres




Page 4 of 227

Información del documento

Subido en
3 de octubre de 2026
Número de páginas
227
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$18.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TutorExpert
3.7
(79)
Vendido
616
Seguidores
315
Artículos
11197
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes