A PJM Member has been granted a maintenance outage for one of their generators
and has scheduled the generator to be removed from service at 2300 this evening.
At 1900, the generator's tube leak worsened, and the generator tripped offline.
The generator outage will be listed as a Forced Outage.
Give this one a try later!
outage will be listed as a Forced Outage.
Auction done once a year on an annual basis.
Give this one a try later!
, Financial Transmission Rights
Monitoring ___________ may give insights into system constraints.
Give this one a try later!
Monitoring LMP's
If not cancelled by PJM, the minimum generation alert expires at the end of the
specified ______________.
Give this one a try later!
light load period
All of the following elements must be reported to PJM when an IRC is requested.
• Operating reserves
• Synchronized reserve
• Non-synchronized reserves
Give this one a try later!
and has scheduled the generator to be removed from service at 2300 this evening.
At 1900, the generator's tube leak worsened, and the generator tripped offline.
The generator outage will be listed as a Forced Outage.
Give this one a try later!
outage will be listed as a Forced Outage.
Auction done once a year on an annual basis.
Give this one a try later!
, Financial Transmission Rights
Monitoring ___________ may give insights into system constraints.
Give this one a try later!
Monitoring LMP's
If not cancelled by PJM, the minimum generation alert expires at the end of the
specified ______________.
Give this one a try later!
light load period
All of the following elements must be reported to PJM when an IRC is requested.
• Operating reserves
• Synchronized reserve
• Non-synchronized reserves
Give this one a try later!