Which of the following are covered under the operations of and maintenance
coordination responsibilities in the agreements between the plant owner and
transmission entities
Give this one a try later!
Physical and cyber security of BES facilities
During a restoration, if you are presented with the opportunity to reconnect with the
Eastern Interconnection, you should
Give this one a try later!
Pursue as quickly as possible
,Under the National Terrorism Advisory System (NTAS) there are two types of alerts:
Elevated Threat Alert and
Give this one a try later!
A. Imminent Threat Alert
What should an entity do if they submit a form OE-417 for a disturbance which falls
within the reporting requirements of the NERC Standard EOP-
Give this one a try later!
B. They should submit a copy of the DOE form OE-417 form to NERC
As part of the restoration process you have verified your communication is functional
and are starting to assess your generating units. Which of the following would be the
first step in that process
Give this one a try later!
Determine the status of of the generating units that have remained online
During a restoration process, once PJM assumes control, which one of the following
statements is correct concerning the requirements for regulation?
Give this one a try later!
, The requirement is 2% of the total interconnected area load
What process does PJM have in place in order to periodically evaluate Synchronized
and Primary reserve estimates in real time
Give this one a try later!
IRC
Status changes on AVR,PSS or other voltage control devices must be communicated
to the TOP within how many minutes
Give this one a try later!
30 minutes
How often must the responsible entities verify the contact information that is
contained in their EOP-004-2 Operating Plan?
Give this one a try later!
D. Annually
During the restoration process, Generation Owners are required to update their
progress by submitting a report
, Give this one a try later!
C. On an hourly basis
If a protective relay or equipment failure reduces system reliability, the generator
Operator shall notify which of the following entities? (Select 2)
Give this one a try later!
C. Transmission Operator
D. Host Balancing Authority
Which of the following data shall be provided to the Regional Reliability Organization
for each installed UVLS system? (Select 2)
Give this one a try later!
A. Breaker operating times
D. Size, location, or percentage of load to be interrupted
In order to properly synchronize a generator to the system, which of the following
variables must be monitored to be successful?
Give this one a try later!
A. Voltage, phase angle, and frequency
coordination responsibilities in the agreements between the plant owner and
transmission entities
Give this one a try later!
Physical and cyber security of BES facilities
During a restoration, if you are presented with the opportunity to reconnect with the
Eastern Interconnection, you should
Give this one a try later!
Pursue as quickly as possible
,Under the National Terrorism Advisory System (NTAS) there are two types of alerts:
Elevated Threat Alert and
Give this one a try later!
A. Imminent Threat Alert
What should an entity do if they submit a form OE-417 for a disturbance which falls
within the reporting requirements of the NERC Standard EOP-
Give this one a try later!
B. They should submit a copy of the DOE form OE-417 form to NERC
As part of the restoration process you have verified your communication is functional
and are starting to assess your generating units. Which of the following would be the
first step in that process
Give this one a try later!
Determine the status of of the generating units that have remained online
During a restoration process, once PJM assumes control, which one of the following
statements is correct concerning the requirements for regulation?
Give this one a try later!
, The requirement is 2% of the total interconnected area load
What process does PJM have in place in order to periodically evaluate Synchronized
and Primary reserve estimates in real time
Give this one a try later!
IRC
Status changes on AVR,PSS or other voltage control devices must be communicated
to the TOP within how many minutes
Give this one a try later!
30 minutes
How often must the responsible entities verify the contact information that is
contained in their EOP-004-2 Operating Plan?
Give this one a try later!
D. Annually
During the restoration process, Generation Owners are required to update their
progress by submitting a report
, Give this one a try later!
C. On an hourly basis
If a protective relay or equipment failure reduces system reliability, the generator
Operator shall notify which of the following entities? (Select 2)
Give this one a try later!
C. Transmission Operator
D. Host Balancing Authority
Which of the following data shall be provided to the Regional Reliability Organization
for each installed UVLS system? (Select 2)
Give this one a try later!
A. Breaker operating times
D. Size, location, or percentage of load to be interrupted
In order to properly synchronize a generator to the system, which of the following
variables must be monitored to be successful?
Give this one a try later!
A. Voltage, phase angle, and frequency