PJM GENERAL QUESTIONS WITH COMPLETE ANSWERS

Vista previa del contenido

What are Descriptive Specifications?


Give this one a try later!


Defines the type of outcome desired but does not list specific products.

It is the most difficult type of specification for an architect to write because
it requires listing all of the criteria that a material or assembly must meet.




Which are included in an Architect;s cost opinion for a project?


Give this one a try later!

, -Hard Costs
-Contractor's overhead and profit
-Contingency Allowances




In order to keep bids as competitive as possible, what type of specification should be
created for the project manual?


Give this one a try later!


Performance-Based

If performance based specifications are used, bidders can submit any
product that meets the performance requirements established.




What is an Affirmative covenant?


Give this one a try later!


Commits a buyer to perform a specific duty in the future.

Ex: By purchasing the grocery store, the owner agrees to maintain the
garden and keep it available for public use.




Which elements would be most effective at reducing the impact of the interstate's
noise on the new development?


Give this one a try later!

, -Sound Barriers
-Vegetated berms


Conifers are effective at reducing the effects of winter winds, ut do little to
prevent sound transmission.




A project manager is preparing an estimate of the cost of work for a project that is
nearing completion of the schematic design phase.


Which of the following statements regarding the cost-of-work estimate are true?


Give this one a try later!


-May be conducted by a cost estimator (instead of the architect) as an
additional service
-Must be revised with each design phase
-May include design contingencies


Contingencies for changes in the work are not included.




At what point in the project are costs best controlled?


Give this one a try later!


At the beginning of the project when determining scope. quality, and the
project delivery method

, What process, as required by the local authority having jurisdiction, will require the
architectural team to provide documentation confirming compliance with limiting
criteria for parking layout, landscaping and screening, signage, and on-site water
retention?


Give this one a try later!


Site plan review




All of the following require details which alllow for movement caused by thermal
changes, ECEPT


Give this one a try later!


Wood Framing

Wood has a low coefficient of thermal expansion In addition, the
connections in wood framing are generally fleible enough to accomodate
any thermal movement that may occur. Concre is very susceptible to
cracking, especially during curing. Metal has a relatively high coeddicient
of thermal expansion. Also paving, gutters, and curtain walls are exposed
to the exterior, where , unlike wood framing they are subject to extreme
temperature vatiation.




What does the phrase "time is of the essence" mean in a contract?


Give this one a try later!

Información del documento

Subido en
1 de octubre de 2026
Número de páginas
78
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$10.50

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CLASSROOMTEST
3.4
(10)
Vendido
53
Seguidores
3
Artículos
7774
Última venta
2 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes