When is a Manual Load Dump Waming issued?
A. When the max emergency is called into the capacity
B. When the contingency reserve is less than the largest contingency
C. When the load exceeds the maximum generator output
D. When the contingency reserve is less than the reserve objective
Give this one a try later!
B. When the contingency reserve is less than the largest contingency
PJM requires that data points that fail for an extended period of time must be
manually updated every
A. 10 minutes
B. 15 minutes
,C. 30 minutes
D. 60 minutes
Give this one a try later!
C. 30 minutes
A PJM neighboring company requests PJM to lend assistance and implement a 5%
voltage reduction PJM will comply with the request provided the neighboring system
has
A. already implemented the same action
B. dumped firm load
C. received NERC approval
D. a signed agreement in place for compensation
Give this one a try later!
A. already implemented the same action
If a generating unit has the following operating limits (Emergency Minimum -25 MW,
Economic Minimum -35 MW , Economic Maximum -150 MW, Emergency Maximum
-155 MW, how many MW of emergency reducible generation would be submitted to
PJM7
A. 5MW
B. 10 MW
C. 25MW
D. 35MW
Give this one a try later!
, B. 10 MW
Which of the following must be completed in order to synchronize if two islands wish
to interconnect during a system restoration event?
A. Loads in the islands must be equal
B. Tie-lines must be established
C. Generation capacity must be within 10% between the islands
D. Phase shifters must be in neutral
Give this one a try later!
B. Tie-lines must be established
What actions does PJM implement for Simultaneous Loss of Double Circuit Tower
contingencies?
A. Load Shed
B. Voltage Reduction
C. Off-cost Operation
D. PJM does not control for these
Give this one a try later!
D. PJM does not control for these
If PJM fails to cancel a Minimum Generation Alert, when will the alert expire?
A. Never, it must be cancelled by PJM
A. When the max emergency is called into the capacity
B. When the contingency reserve is less than the largest contingency
C. When the load exceeds the maximum generator output
D. When the contingency reserve is less than the reserve objective
Give this one a try later!
B. When the contingency reserve is less than the largest contingency
PJM requires that data points that fail for an extended period of time must be
manually updated every
A. 10 minutes
B. 15 minutes
,C. 30 minutes
D. 60 minutes
Give this one a try later!
C. 30 minutes
A PJM neighboring company requests PJM to lend assistance and implement a 5%
voltage reduction PJM will comply with the request provided the neighboring system
has
A. already implemented the same action
B. dumped firm load
C. received NERC approval
D. a signed agreement in place for compensation
Give this one a try later!
A. already implemented the same action
If a generating unit has the following operating limits (Emergency Minimum -25 MW,
Economic Minimum -35 MW , Economic Maximum -150 MW, Emergency Maximum
-155 MW, how many MW of emergency reducible generation would be submitted to
PJM7
A. 5MW
B. 10 MW
C. 25MW
D. 35MW
Give this one a try later!
, B. 10 MW
Which of the following must be completed in order to synchronize if two islands wish
to interconnect during a system restoration event?
A. Loads in the islands must be equal
B. Tie-lines must be established
C. Generation capacity must be within 10% between the islands
D. Phase shifters must be in neutral
Give this one a try later!
B. Tie-lines must be established
What actions does PJM implement for Simultaneous Loss of Double Circuit Tower
contingencies?
A. Load Shed
B. Voltage Reduction
C. Off-cost Operation
D. PJM does not control for these
Give this one a try later!
D. PJM does not control for these
If PJM fails to cancel a Minimum Generation Alert, when will the alert expire?
A. Never, it must be cancelled by PJM