• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 73 páginas
Examen

Cfcm Study Guide Actual Questions With Verified Solutions

Document preview thumbnail
Vista previa 4 fuera de 73 páginas

CFCM STUDY GUIDE ACTUAL QUESTIONS WITH VERIFIED SOLUTIONS

Vista previa del contenido

CFCM STUDY GUIDE ACTUAL QUESTIONS
WITH VERIFIED SOLUTIONS

◉ Protests may be filed with


a. either the agency or the GAO.
b. the agency, the GAO, or the U.S. Court of Claims.
c. either the contracting officer or the U.S. Court of Federal Claims.
d. Small Claims Court for awards under the SAT.
Answer: b. the agency, the GAO, or the U.S. Court of Claims.


FAR 33.102


◉ Who can authorize continued performance in the face of a protest
after award?


a. the chief of the contracting office
b. the CO, provided his findings are documented in the file.
c. the head of the contracting activity.
d. the commanding officers.
Answer: c. the head of the contracting activity.

,FAR 33.104(c)(2)


◉ The CO shall consider all protests and seek legal advice


a. only if protests are received after award and filed directly with the
agency.
b. only if the protest is received after award and filed directly with
the GAO.
c. whether protests are submitted before or after award.
d. whether protests are submitted before or after award and
whether filed directly with the GAO, the U.S Court of Claims, or the
agency.
Answer: d. whether protests are submitted before or after award
and whether filed directly with the GAO, the U.S Court of Claims, or
the agency.


FAR 33.102


◉ A protest based upon improprieties in a solicitation must be filed
before bid opening or the closing date for receipt of proposals. in all
other cases, protests must be filed

,a. within 10 calendar days of the time the protester knew or should
have known of the basis of the protest, whichever is earlier.
b. within 100 calendar days of the time the protester knew or should
have known of the basis of the protest, whichever is earlier.
c. within 5 days after a debriefing date to the other offerors.
d. within 15 days before the acceptance of offers.
Answer: a. within 10 calendar days of the time the protester knew or
should have known of the basis of the protest, whichever is earlier.


FAR 33.103


◉ The responsibility for selecting the appropriate type of contract
for an R&D requirement belongs to the


a. program manager.
b. CO.
c. acquisition manager
d. R&D Chief
Answer: b. CO.


FAR 35.006(b)

, ◉ The methodologies contracting officers shall use in acquiring
construction contracts and architect-engineer services, respectively,
are


a. negotiation and sealed bids
b. sealed bids and negotiation.
c. negotiation and negotiation.
d. sealed bids and barter.
Answer: b. sealed bids and negotiation.


FAR 36.103


◉ The Federal Supply Schedule program provides federal agencies


a. sources for meeting repetitive requirements on a scheduled basis.
b. a simplified process for obtaining commercial supplies and
services and prices associated with volume buying.
c. a mandatory source for frequently used supplies and services at
prices associated with buying in volume.
d. a simplified process for obtaining complex services that the
requiring agency does not have the expertise to buy.
Answer: b. a simplified process for obtaining commercial supplies
and services and prices associated with volume buying.

Información del documento

Subido en
30 de septiembre de 2026
Número de páginas
73
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$16.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
FocusFile7
4.0
(29)
Vendido
309
Seguidores
5
Artículos
78366
Última venta
14 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes