WGU_C215_OPERATIONS_MANAGEMENT_FINAL_CERTIFICATION_SCRIPT_2026_TESTED.pdf

Vista previa del contenido

WGU C215 OPERATIONS MANAGEMENT FINAL
CERTIFICATION SCRIPT TESTED

◉ order qualifiers. Answer: competitive priorities that must be met
for a company to qualify as a competitor in the marketplace


◉ order winners. Answer: competitive priorities that win orders in
the marketplace


◉ output-based (incentive) systems. Answer: pay based on the
number of units completed


◉ overtime. Answer: work beyond normal established operation
hours that usually requires a premium be paid to the workers


◉ Pareto analysis. Answer: a technique used to identify quality
problems based on their degree of importance


◉ partial productivity. Answer: productivity computed as a ratio of
output to only one input (e.g., labor, materials, machines)

,◉ percentage of dollar volume shipped on schedule. Answer: a
customer service measure appropriate when customer orders vary
in value


◉ percentage of line items shipped on schedule. Answer: a customer
service measure appropriate when customer orders vary in number
of line items ordered


◉ percentage of orders shipped on schedule. Answer: a customer
service measure appropriate for use when orders have similar value


◉ performance rating factor. Answer: a subjective estimate of a
worker's pace relative to a normal work pace


◉ periodic counting. Answer: a physical inventory is taken
periodically, usually annually


◉ pessimistic time estimate. Answer: the longest time period in
which the activity will be completed


◉ plan-do-study-act (PDSA) cycle. Answer: a diagram that describes
the activities that need to be performed to incorporate continuous
improvement into the operation

,◉ point of departure. Answer: the percentage of normal capacity the
company is currently using


◉ policy constraint. Answer: the condition that results when a
specific policy dictates the rate of production


◉ precedence relationships. Answer: establishes the sequencing of
activities to ensure that all necessary activities are completed before
a subsequent activity is begun


◉ predetermined time data. Answer: published database of
elemental time data used for establishing standard times


◉ prevention costs. Answer: costs incurred in the process of
preventing poor quality from occurring


◉ probabilistic time estimate. Answer: process that uses optimistic,
most likely, and pessimistic time estimates


◉ problem-solving teams. Answer: small groups of employees and
supervisors trained in problem-solving techniques who meet to
identify, analyze, and propose solutions to workplace problems

, ◉ process capability. Answer: the ability of a production process to
meet or exceed preset specifications


◉ process capability index. Answer: an index used to measure
process capability


◉ process flow analysis. Answer: a technique used for evaluating a
process in terms of the sequence of steps from inputs to outputs
with the goal of improving its design


◉ process flowchart. Answer: a chart showing the sequence of steps
in producing the product or service


◉ process layouts. Answer: layouts that group resources based on
similar processes or functions


◉ process performance metrics. Answer: measurements of different
process characteristics that tell how a process is performing


◉ process velocity. Answer: ratio of throughput time to value-added
time


◉ product layouts. Answer: layouts that arrange resources in
sequence to allow for an efficient buildup of the product

Información del documento

Subido en
30 de septiembre de 2026
Número de páginas
77
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$17.89

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
4
Seguidores
0
Artículos
8066
Última venta
3 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes