◉ As distance from the potential explosion site decreases, the
potential for damage to an exposed site from an explosion.... Answer:
increases.
◉ Your installation is increasing the NEW for a storage site built in
1969 and storing a hazard division that was not previously approved
for that location. Do you need to complete an ESSP? Answer: Yes, and
it requires DDESB approval.
◉ Intraline distance (ILD) is the minimum distance permitted
between... Answer: two operating buildings.
◉ The purpose of an ESSP is to ensure safety, provide specifications,
and... Answer: establish limits.
◉ You must submit an ESSP for DDESB approval if the installation
is... Answer: building an ES within an existing ESQD arc.
FAMILIARIZATION AMMO 63 FINAL
PAPER QUESTIONS WITH CORRECT
ANSWERS VERIFIED
◉ As distance from the potential explosion site decreases, the
potential for damage to an exposed site from an explosion.... Answer:
increases.
◉ Your installation is increasing the NEW for a storage site built in
1969 and storing a hazard division that was not previously approved
for that location. Do you need to complete an ESSP? Answer: Yes, and
it requires DDESB approval.
◉ Intraline distance (ILD) is the minimum distance permitted
between... Answer: two operating buildings.
◉ The purpose of an ESSP is to ensure safety, provide specifications,
and... Answer: establish limits.
◉ You must submit an ESSP for DDESB approval if the installation
is... Answer: building an ES within an existing ESQD arc.