◉ Which ESSP category addresses PES and ES that do not meet the
deterministic QD criteria, but do meet DDESB-approved, risk-based
siting acceptance criteria? Answer: RBSB
◉ Your installation is increasing the NEW for a storage site built in
1969 and storing a hazard division that was not previously approved
for that location. Do you need to complete an ESSP? Answer: Yes, and
it requires DDESB approval.
◉ Intraline distance (ILD) is the minimum distance permitted
between... Answer: two operating buildings.
◉ The purpose of an ESSP is to ensure safety, provide specifications,
and... Answer: establish limits.
◉ You must submit an ESSP for DDESB approval if the installation
is... Answer: building an ES within an existing ESQD arc.
FAMILIARIZATION AMMO 63 EXAM
STUDY GUIDE FULL QUESTIONS
AND VERIFIED SOLUTIONS
◉ Which ESSP category addresses PES and ES that do not meet the
deterministic QD criteria, but do meet DDESB-approved, risk-based
siting acceptance criteria? Answer: RBSB
◉ Your installation is increasing the NEW for a storage site built in
1969 and storing a hazard division that was not previously approved
for that location. Do you need to complete an ESSP? Answer: Yes, and
it requires DDESB approval.
◉ Intraline distance (ILD) is the minimum distance permitted
between... Answer: two operating buildings.
◉ The purpose of an ESSP is to ensure safety, provide specifications,
and... Answer: establish limits.
◉ You must submit an ESSP for DDESB approval if the installation
is... Answer: building an ES within an existing ESQD arc.