NERC text questions | Actual Questions and Answers Latest Updated 2026/2027 (Graded A+)

Document preview thumbnail
Vista previa 3 fuera de 26 páginas

NERC text questions | Actual Questions and Answers Latest Updated 2026/2027 (Graded A+)

Vista previa del contenido

NERC text questions | Actual Questions and Answers Latest
Updated 2026/2027 (Graded A+)

•
Operating reserve may be provided by which of the following?
A. LTCs
B. Capacitor banks
C. Voltage regulators
D. Interruptible loads
- ✔✔D. Interruptible loads

•
Which of the following is the responsibility of a reserve sharing group (RSG)?
A. Complying with DCS as if it was a single control area
B. Proving regulation service for neighboring RSGs
C. Ensuring each control area in the group maintains 50% blackstart capability
D. Complying with the control performance standards as if it was a single control area
- ✔✔A. Complying with DCS as if it was a single control area

•
Generation is not sufficient to meet load, the control area is importing heavily, and voltage is decaying,
which of the following actions should be taken by the operator?
A. Shed load
B. Correct schedule deviation
C. Use the Interconnection Hotline
D. Schedule interchange transaction
- ✔✔A. Shed load

•
What measures power flow data between control areas?
A. OASIS
B. Interchange
C. Transactions
D. Tie-Line metering
- ✔✔D. Tie-Line metering

•
Transmission line removal as a voltage control can be used if:
A. Loop flow remains high
B. Reactive equipment is available
C. Reliability stays at acceptable levels
D. Synchronous condensers are off the line
- ✔✔C. Reliability stays at acceptable levels

,•
Control Area A is generating and sending Control Area B a schedule. Both control areas should verify
all of the following EXCEPT:
A. Magnitude (MW)
B. Ramp rate
C. Price
D. Start/stop times
- ✔✔C. Price

•
The AGC control mode that is normally used for system operation is:
A. Flat Tie Mode
B. Flat Frequency Mode
C. Frequency Bias Mode
D. Tie Line Bias Mode
- ✔✔D. Tie Line Bias Mode

•
There has been a wide-area disturbance. The transfers through the system have increased and there is
a possibility that loss of one major tie line would cause corresponding loading and voltage deviations.
Having system resources available, the security coordinator should:
A. Increase generation to reduce flows across the ties
B. Implement schedule changes across the hour
C. Implement a voltage reduction plan
D. Advise the supervisor
- ✔✔A. Increase generation to reduce flows across the ties

•
When referring to transmission lines of an interconnected network, neighboring systems should use:
A. Own line identifiers and ratings B. NERC line identifiers and ratings
C. Region line identifiers and ratings
D. Uniform (common) line identifiers and ratings
- ✔✔D. Uniform (common) line identifiers and ratings

•
To what level should a control area maintain its own reactive reserves?
A. 105% voltage level
B. 95% voltage level
C. First contingency conditions
D. Second contingency conditions
- ✔✔C. First contingency conditions

•
Which load shedding step should be implemented first (per Policy 6B)?
A. Manual
B. Underfrequency
C. Rate of voltage decay
D. Rate of frequency decay
- ✔✔A. Manual

, •
Between sending, receiving, and intermediary control areas, what is the minimum information
pertaining to an interchange schedule that must be confirmed?
1. The scheduling path & magnitude of the transaction
2. The Start/stop times, ramp times, and duration
3. Price of energy
4. Loss accounting including MVAR at points of receipt and delivery
A. 1 and 2
B. 1 and 4
C. 2 and 3
D. 3 and 4
- ✔✔A. 1 and 2

•
Control areas shall NOT operate to cause any other system to violate established operating reliability
criteria from changes made to: A. Interchange schedules
B. Capacitor banks
C. Reactors
D. LTCs
- ✔✔A. Interchange schedules

•
Per Policy 4, 4A, In order to predict the system's near term load pattern, a system operator must have
information including weather forecasts and:
A. Sufficient metering
B. Past load patterns
C. Projected load patterns
D. Generator overhaul schedules
- ✔✔B. Past load patterns

•
All of the following electric system security data are to be updated at least every 10 minutes EXCEPT:
A. Operating reserve
B. Control area demand
C. Area control area frequency
D. Forecast changes on equipment status
- ✔✔D. Forecast changes on equipment status

•
Security Coordinator A requests Reliability Coordinator B to curtail a transaction from B to C. The
Reliability Coordinator B should do which of the following:
A. Ask A to redispatch
B. Honor the request
C. Implement voltage reduction
D. Coordinate with regional office
- ✔✔B. Honor the request

Información del documento

Subido en
26 de septiembre de 2026
Número de páginas
26
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$17.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Vendido
31
Seguidores
1
Artículos
19519
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes