• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 42 páginas
Examen

VA HIC FINAL EXAM/VA HIC EXAM PRACTICE 2025 QUESTIONS AND ANSWERS

Document preview thumbnail
Vista previa 4 fuera de 42 páginas

VA HIC FINAL EXAM/VA HIC EXAM PRACTICE 2025 QUESTIONS AND ANSWERS

Vista previa del contenido

VA HIC FINAL EXAM/VA HIC EXAM
PRACTICE 2025 QUESTIONS AND
ANSWERS
Section 1: Licensing, Business Practices & Virginia Regulations (Questions 1–
22)
1. Under Virginia DPOR regulations, a Class C contractor license is valid for
projects with a total value of less than what amount?
A. $10,000
B. $10,000
C. $50,000
D. $120,000

Rationale: In Virginia, a Class C contractor license is limited to projects with a
total value of less than $10,000. Class B covers projects between $10,000 and
$120,000, and Class A covers projects of $120,000 or more.


2. A Virginia HIC contractor license is required for which of the following?
(SATA)

A. Remodeling a kitchen in a single-family home
B. Replacing a roof on a residential property
C. Building a residential addition
D. Performing routine maintenance on a commercial building
E. Installing a driveway on residential property

Rationale: The Virginia Home Improvement Contractor license applies to
residential home improvement work including remodeling, roofing, additions, and
driveways. Commercial building maintenance is not covered under the HIC license
scope.

,3. What is the maximum amount a Class B contractor in Virginia may
undertake on a single project?
A. $10,000
B. $50,000
C. $120,000
D. $500,000

Rationale: Virginia Class B contractor licenses allow projects valued between
$10,000 and $120,000. Projects exceeding $120,000 require a Class A license.


4. An employee brings their own personal protective equipment to a job site.
Who is responsible for ensuring that equipment is properly maintained and in
safe working condition?
A. The employee
B. The employer
C. The equipment manufacturer
D. The general contractor on site

Rationale: OSHA regulations place the responsibility for maintaining personal
protective equipment on the employer, regardless of who purchased or provided
the equipment. The employer must ensure all PPE is inspected, maintained, and
replaced as needed.


5. Which Virginia agency is responsible for issuing contractor licenses?
A. Virginia Department of Transportation
B. Virginia Department of Professional and Occupational Regulation (DPOR)
C. Virginia Department of Health
D. Virginia State Corporation Commission

Rationale: The Virginia Department of Professional and Occupational
Regulation (DPOR) is the state agency that licenses and regulates contractors,
including Home Improvement Contractors.

,6. A contractor licensed as Class C may perform work on a project valued at
$12,000 if:
A. The homeowner signs a waiver
B. The contractor hires a Class A subcontractor
C. This is never allowed under a Class C license
D. The work is completed in under 30 days

Rationale: A Class C license strictly limits the contractor to projects under
$10,000. No waiver or subcontracting arrangement permits a Class C licensee to
exceed this threshold.


7. When must a contractor provide a written contract to a homeowner in
Virginia?
A. Only when the project exceeds $1,000
B. For any home improvement project, regardless of value
C. Only for projects requiring a building permit
D. Only when requested by the homeowner

Rationale: Virginia law requires a written contract for all home improvement
projects. The contract must include specific disclosures, a description of work, total
cost, and cancellation rights.


8. Which of the following is a valid reason for DPOR to suspend or revoke a
contractor license? (SATA)

A. Abandoning a project without cause
B. Willful violation of building codes
C. Obtaining a license through fraud
D. Being late to a scheduled inspection
E. Misappropriation of customer funds

, Rationale: DPOR may suspend or revoke a license for serious violations
including project abandonment, code violations, fraud, and fund misappropriation.
Being late to an inspection is not grounds for revocation.


9. What is the minimum general liability insurance requirement for a Virginia
Class A contractor?
A. $50,000
B. $100,000
C. $500,000
D. $1,000,000

Rationale: Virginia requires Class A contractors to maintain minimum general
liability insurance of $500,000. Class B requires $100,000 and Class C requires
$50,000.


10. A homeowner refuses to pay a contractor for completed work. What is the
contractor’s best first course of action?
A. Immediately file a lawsuit
B. Send a written demand letter and attempt to resolve through negotiation or
mediation
C. Place a lien on the property without notice
D. Report the homeowner to DPOR

Rationale: Contractors should first attempt to resolve payment disputes
through direct communication, written demand, and mediation before pursuing
legal remedies such as liens or lawsuits.


11. Which of the following best describes “substantial completion” in a home
improvement contract?
A. When the contractor has finished all work including punch list items
B. When the work is sufficiently complete that the owner can use it for its

Información del documento

Subido en
25 de septiembre de 2026
Número de páginas
42
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$25.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
0
Artículos
353
Última venta
-



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes