MGMT 339 - MIDTERM 2 VERIFIED STUDY GUIDE
capacity - Answers - The upper limit or ceiling on the LOAD that an OPERATING UNIT
can handle.
Load - Answers - # of physical units produced (e.g., # of bicycles assembled per hour)
OR
# of services performed (e.g., # of computers upgraded per hour).
Operating unit - Answers - a plant, department, machine, store, worker, etc.
Goal of strategic capacity planning - Answers - achieve a match between the long-term
supply capabilities of an organization and the predicted level of long-term demand.
Design capacity - Answers - The MAXIMUM output rate or service capacity an
operation, process or facility is designed for (i.e., theoretical perfection).
Effective capacity - Answers - Design capacity minus allowances such as personal time,
and maintenance.
The capacity a firm expects to achieve given current operating constraints
Actual capacity - Answers - Rate of output actually achieved.
Design, effective, and actual capacity (from highest to lowest) - Answers - Design
Effective
Actual
Measures of effectiveness - Answers - Capacity efficiency
Capacity utilization
Capacity efficiency - Answers - Actual Output / Effective Capacity x 100
Capacity utilization - Answers - Actual Output / Design Capacity x 100
Does high efficiency always indicate an effective use of resources? - Answers - NO
Bottleneck operation - Answers - An operation in a sequence of operations whose
capacity is lower than the capacities of other operations in the sequence.
, The capacity of the bottleneck operation limits the system capacity.
The capacity of the system is reduced to the capacity of the bottleneck operation.
Optimal output rate - Answers - Cost per unit is the lowest for the production unit.
Economies of scale - Answers - The output rate is less than the optimal level.
Increasing the output rate results in decreasing average unit costs.
Diseconomies of scale - Answers - The output rate is more than the optimal level.
Increasing the output rate results in increasing average unit costs.
Cost volume analysis - Answers - focuses on relationships between cost, revenue, and
volume of output.
Purpose:
Estimate the income of an organization under different operating conditions
.
Useful tool for comparing capacity alternatives.
Fixed costs - Answers - remain constant regardless of volume of output.
(e.g., equipment costs, property taxes, etc.)
Variable costs - Answers - vary directly with quantity/volume of output.
(e.g., materials, labor costs, etc.)
Break even point - Answers - The volume of output at which total cost and total revenue
are equal.
Process selection - Answers - Deciding on the way production of goods or services will
be organized.
Primary considerations of process selection - Answers - Variety and volume
Variety - Answers - How much variety in products or services will the system need to
handle?
Volume - Answers - What is the expected volume of output?
Process types - Answers - Job shop
Batch
Repetitive
capacity - Answers - The upper limit or ceiling on the LOAD that an OPERATING UNIT
can handle.
Load - Answers - # of physical units produced (e.g., # of bicycles assembled per hour)
OR
# of services performed (e.g., # of computers upgraded per hour).
Operating unit - Answers - a plant, department, machine, store, worker, etc.
Goal of strategic capacity planning - Answers - achieve a match between the long-term
supply capabilities of an organization and the predicted level of long-term demand.
Design capacity - Answers - The MAXIMUM output rate or service capacity an
operation, process or facility is designed for (i.e., theoretical perfection).
Effective capacity - Answers - Design capacity minus allowances such as personal time,
and maintenance.
The capacity a firm expects to achieve given current operating constraints
Actual capacity - Answers - Rate of output actually achieved.
Design, effective, and actual capacity (from highest to lowest) - Answers - Design
Effective
Actual
Measures of effectiveness - Answers - Capacity efficiency
Capacity utilization
Capacity efficiency - Answers - Actual Output / Effective Capacity x 100
Capacity utilization - Answers - Actual Output / Design Capacity x 100
Does high efficiency always indicate an effective use of resources? - Answers - NO
Bottleneck operation - Answers - An operation in a sequence of operations whose
capacity is lower than the capacities of other operations in the sequence.
, The capacity of the bottleneck operation limits the system capacity.
The capacity of the system is reduced to the capacity of the bottleneck operation.
Optimal output rate - Answers - Cost per unit is the lowest for the production unit.
Economies of scale - Answers - The output rate is less than the optimal level.
Increasing the output rate results in decreasing average unit costs.
Diseconomies of scale - Answers - The output rate is more than the optimal level.
Increasing the output rate results in increasing average unit costs.
Cost volume analysis - Answers - focuses on relationships between cost, revenue, and
volume of output.
Purpose:
Estimate the income of an organization under different operating conditions
.
Useful tool for comparing capacity alternatives.
Fixed costs - Answers - remain constant regardless of volume of output.
(e.g., equipment costs, property taxes, etc.)
Variable costs - Answers - vary directly with quantity/volume of output.
(e.g., materials, labor costs, etc.)
Break even point - Answers - The volume of output at which total cost and total revenue
are equal.
Process selection - Answers - Deciding on the way production of goods or services will
be organized.
Primary considerations of process selection - Answers - Variety and volume
Variety - Answers - How much variety in products or services will the system need to
handle?
Volume - Answers - What is the expected volume of output?
Process types - Answers - Job shop
Batch
Repetitive