Which of the project delivery phases is the team engaged in?
Pre-design
Identify the tasks they must accomplish during the predesign phase.
All the above
-Assess the appropriateness of the site
-select a design team
-define building program
-identify govt constraints
One of the most critical features of the design development phase of the
building delivery process is
making decisions about pragmatic solutions for various building systems
Not one of the required items of a set of construction drawings
Digital "walk-throughs"
A specification is a written document that provides information about
_________ of a given material as opposed to the quantity
quality
, The divisions the architect is most concerned with
2-14
Fast-track construction bidding
competitive bidding method
During the construction phase, the architect
observes construction on a regular basis
The project manual is composed entirely of specifications
False
What part of the design and construction is not regulated by the building
code?
Aesthetic qualities
Building codes primary objective
provide a minimum level of safety
Construction begins after
an application for a building permit has been approved and received by the owner
Height of a guardrail and the clear space between members are a fire safety
regulation
Answers
Which of the project delivery phases is the team engaged in?
Pre-design
Identify the tasks they must accomplish during the predesign phase.
All the above
-Assess the appropriateness of the site
-select a design team
-define building program
-identify govt constraints
One of the most critical features of the design development phase of the
building delivery process is
making decisions about pragmatic solutions for various building systems
Not one of the required items of a set of construction drawings
Digital "walk-throughs"
A specification is a written document that provides information about
_________ of a given material as opposed to the quantity
quality
, The divisions the architect is most concerned with
2-14
Fast-track construction bidding
competitive bidding method
During the construction phase, the architect
observes construction on a regular basis
The project manual is composed entirely of specifications
False
What part of the design and construction is not regulated by the building
code?
Aesthetic qualities
Building codes primary objective
provide a minimum level of safety
Construction begins after
an application for a building permit has been approved and received by the owner
Height of a guardrail and the clear space between members are a fire safety
regulation