Examen

PMT 4800-DAWIA PM Practitioner Exam Questions and Correct Answers Latest

Document preview thumbnail
Vista previa 4 fuera de 299 páginas

PMT 4800-DAWIA PM Practitioner Exam Questions and Correct Answers Latest

Vista previa del contenido

PMT 4800: DAWIA PM Practitioner Exam
Questions and Correct Answers Latest
Question 1

You are a government Program Manager, and you suspect the contractor's test
results stated in the new procurement proposal are inaccurate. You should:

Report up the chain of command that the data which the contractor used in the
proposal may be flawed.

Do nothing until you have evidence of the veracity of the test results.

Not report the test-data problem up the chain of command; but rather deal with it
locally.

Report the problem to the DoD IG Fraud, Waste and Abuse hotline, citing the
contractor for inaccurately touting performance in those tests.

Correct Answer
Report up the chain of command that the data which the contractor used in the
proposal may be flawed.




Page 1 of 299

,Question 2

The program office for a Navy shipboard communications system early in the
TMRR phase just conducted an affordability analysis of their key performance
parameters. The program can save 10% on overall life cycle cost by trading 5%
of point to point surface communications range KPP for greater component
reliability. The Navy CDD sponsor agreed to include the requirements change as
part of staffing for the CDD-V. Choose the greatest potential impact of the
changed requirements on the Logistics Functional area.

Changes to maintenance and supply planning based on the new component

Changes to manufacturing methods

Modification of the contract

Additional testing to verify that new requirements are met without impacting other
requirements

Correct Answer
Changes to maintenance and supply planning based on the new component



Question 3

Which of the following is a primary objective of the Defense Acquisition
System?

Acquire products at the lowest possible cost

Provide measurable improvement in mission capabilities

Remain flexible in response to political pressure

Divide work evenly among contractors to manage risk

Correct Answer
Provide measurable improvement in mission capabilities




Page 2 of 299

,Question 4

Which of the following statements best describe life cycle logistics?

Logistics is an inherent part of the system’s design, development, testing and
production

Sustainability is the capacity of the organization to prevail in the face of potential
destruction

Logistics is a sustainment planning function that must be part of every system
beginning at Milestone C

The life cycle function terminates at full rate production

Correct Answer
Logistics is an inherent part of the system's design, development, testing and
production



Question 5

Defense policy requires designated systems to be certified as interoperable. In
part, testing to ensure interoperability is conducted to determine if the system
is:

Configured in such a manner that the user is able to operate the system without any
specialized training.

Able to provide and receive data from other systems.

Fully compatible with potential threat force systems, units, and doctrine.

Consistent with commercial standards and best industry practices.

Correct Answer
Able to provide and receive data from other systems.




Page 3 of 299

, Question 6

Select the Department of Defense's (DoD's) decision-support system described
as: "DoD's primary resource allocation process that is calendar-driven."

Planning, Programming, Budgeting, and Execution (PPBE)

Risk Assessment and Management System (RAM)

Defense Acquisition Management System (DAS)

Joint Capabilities Integration and Development System (JCIDS)

Correct Answer
Planning, Programming, Budgeting, and Execution (PPBE)



Question 7

Cybersecurity planning activities, including writing the Cybersecurity Strategy
annex to the Program Protection Plan, should begin____________________.

With the implementation of performance based support

In full rate production

During the Material Solution Analysis Phase prior to Milestone A

After the Capability Development Document Validation

Correct Answer
During the Material Solution Analysis Phase prior to Milestone A




Page 4 of 299

Información del documento

Subido en
24 de septiembre de 2026
Número de páginas
299
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$18.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TutorExpert
3.7
(79)
Vendido
616
Seguidores
315
Artículos
11197
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes