• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 60 páginas
Examen

CA Class A General Engineering Contractor Exam Questions and Correct Answers (Verified Answers) Plus Rationale 2027 Q&A| Instant Download Pdf

Document preview thumbnail
Vista previa 4 fuera de 60 páginas

CA Class A General Engineering Contractor Exam Questions and Correct Answers (Verified Answers) Plus Rationale 2027 Q&A| Instant Download Pdf

Vista previa del contenido

CA Class A General Engineering Contractor
Exam Questions and Correct Answers (Verified
Answers) Plus Rationale 2027 Q&A| Instant
Download Pdf


1. What is the primary purpose of a site investigation before
beginning a major engineering construction project?

A. To determine the contractor's profit margin
B. To eliminate the need for engineering plans
C. To identify existing site conditions that may affect construction
D. To establish the final payment schedule

Answer: C. To identify existing site conditions that may affect
construction

Rationale: A site investigation provides information about soil,
groundwater, existing utilities, topography, access, environmental
conditions, and other physical characteristics. Understanding these
conditions allows the contractor and design team to plan appropriate
construction methods and reduce unforeseen problems.

, 2. Which instrument is commonly used by surveyors to measure
horizontal and vertical angles accurately?

A. Plate compactor
B. Total station
C. Concrete vibrator
D. Moisture meter

Answer: B. Total station

Rationale: A total station is an electronic surveying instrument that
combines angle measurement with electronic distance measurement.
It is widely used to establish points, elevations, alignments, and
locations during engineering construction.

3. What is the primary function of a benchmark in construction
surveying?

A. To store construction materials
B. To provide a known elevation reference
C. To measure concrete strength
D. To determine equipment fuel consumption

Answer: B. To provide a known elevation reference

Rationale: A benchmark is a fixed reference point with a known
elevation. Surveyors use it to establish or transfer elevations

,throughout a project so that grades, foundations, drainage systems,
roads, and other features are constructed at the required elevations.

4. When preparing a construction schedule, the critical path
identifies activities that:

A. Have the lowest labor cost
B. Can always be delayed without consequences
C. Determine the minimum project completion time
D. Require the largest number of workers

Answer: C. Determine the minimum project completion time

Rationale: The critical path consists of activities that control the
earliest possible completion date of the project. Delaying a critical-
path activity generally delays the project unless corrective action or
schedule recovery measures are implemented.

5. What is the primary purpose of a construction submittal?

A. To replace the contract
B. To provide required technical information for review and approval
C. To establish the contractor's tax rate
D. To eliminate inspections

Answer: B. To provide required technical information for review and
approval

, Rationale: Submittals may include shop drawings, product data,
samples, mix designs, certifications, and other technical information.
They allow the appropriate project parties to verify that proposed
materials and methods comply with project requirements.

6. Which soil property describes the ability of soil to support loads
without excessive deformation or failure?

A. Bearing capacity
B. Permeability
C. Plasticity
D. Moisture content

Answer: A. Bearing capacity

Rationale: Bearing capacity refers to the ability of soil to safely
support applied loads. It is particularly important for foundations,
retaining structures, embankments, and other structures that transfer
loads into the ground.

7. What is the main purpose of soil compaction?

A. To increase voids in the soil
B. To reduce soil density
C. To increase soil density and improve stability
D. To increase the soil's organic content

Información del documento

Subido en
23 de septiembre de 2026
Número de páginas
60
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$23.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Docsolutions
4.1
(23)
Vendido
78
Seguidores
5
Artículos
4412
Última venta
5 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes