Examen

SCM 300 Exam 3 Davilla Exam Questions with Correct Answers (Grade A+)

Document preview thumbnail
Vista previa 3 fuera de 24 páginas

SCM 300 Exam 3 Davilla Exam Questions with Correct Answers (Grade A+)

Vista previa del contenido

SCM 300 Exam 3 Davilla Exam Questions with Correct Answers
(Grade A+)

Question 1: Competitive priorities

Answer: 1. cost 2. quality 3. speed/time 4. flexibility


Question 2: Value

Answer: what i get/price


Question 3: Productivity

Answer: what i make/cost


Question 4: SCM key components

Answer: 1. Procurement 2. Operations 3. Logistics


Question 5: Procurement

Answer: Buy it: process of obtaining services, supplies, and equipment in conformance with corporate
regulations


Question 6: Operations

Answer: Make it: makes business processes effective and efficient. They help the organization create high
quality products/ services using the fewest resources


Question 7: Logistics

Answer: Move it: developing the transportation itinerary and finding reliable transportation and storage
partners, to be able to navigate the flow of materials to the final destination


Question 8: Reverse logistics

Answer: reuse of production and materials


Question 9: 1st tier suppliers

Answer: a company's direct supplier. A firm that directly provides goods and/ or services to a company



Page 1

,Question 10: 2nd tier suppliers

Answer: a firm provides goods and/ or services to a company's first-tier supplier


Question 11: Downstream

Answer: direction in which products flow towards an end consumer. Direction is the right. Storage and
consolidation/sorting picking and packing, labeling


Question 12: Upstream

Answer: direction from customers to suppliers. Direction is the left central return center AKA reverse
logistics activities


Question 13: Safety stock

Answer: protects against uncertainty in demand, lead time, supply not intended to be used. cushion,
insurance, etc


Question 14: Pipeline inventory

Answer: Orders that have been placed but not yet received nor paid for by customer Inventory "on its way"
to the customer


Question 15: Vertical integration

Answer: company taking on additional supply classes (Forward and backward)


Question 16: Order less

Answer: if holding cost too high


Question 17: Order more

Answer: If holding cost too low


Question 18: Low inventory pros

Answer: less storage space required (lowering holding cost), lower chance of inv shrinkage, less materials
handling, less money invested in inventory *Cons for High Inventory




Page 2

, Question 19: High inventory pros

Answer: higher levels of customer service (having inventory addresses immediate demand), quantity
discounts possible, fewer orders will be placed, greater security against unexpected demand variability
*Cons for Low Inventory


Question 20: order cost < Carrying cost

Answer: when to use eoq


Question 21: Supplier considerations

Answer: consumer needs, cost quality speed & flex, technological capability, location, information
technology system, ability to innovate, capacity potential, 2nd & 3rd tier suppliers, reliability, and service


Question 22: holding cost = ordering cost

Answer: EOQ formula


Question 23: Bottleneck

Answer: slowest or weakest workstation in assembly line


Question 24: Line flow strategy

Answer: -make items fast and make it over and over. everything goes down a line Demand: Standard Items,
High Volumes, Static Industry Layout: Product Focused/Line Flow Layouts Manufacturing system:
Assembly Lines, Continuous Flow Systems Make-to-stock systems


Question 25: Flexible flow strategy

Answer: every item made is different, work can go in any direction Demand: Customized Items, Low
Volumes, Dynamic Industry Layout: Process Focused/Flexible Flow Layouts Manufacturing system: Job
Shops Make-to-order systems


Question 26: Hybrid strategy

Answer: every item is the same but one aspect is different (ie car color) Demand: Moderation
(Customization, Changes, Industry) Layout: Hybrid Layouts Manufacturing system: Group Technology
(Cellular) Layout Possibly an Assemble-to-order system




Page 3

Información del documento

Subido en
22 de septiembre de 2026
Número de páginas
24
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DrJon
3.8
(160)
Vendido
593
Seguidores
188
Artículos
23563
Última venta
13 horas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes