MAINTAINING QUALITY, Continous improvement and LEAN six sigma with solution

Document preview thumbnail
Vista previa 4 fuera de 31 páginas

MAINTAINING QUALITY, Continous improvement and LEAN six sigma with solution

Vista previa del contenido

D469 TEST 2 WITH CORRECT QUESTIONS AND
ANSWERS.

,
,As part of the contract documents, what are the written documents called
that describe the required materials, requirements for the execution of the
work, and workmanship expected?

a. Construction drawings

b. Contracts

c. Punch lists

d. Specifications

e. Shop drawings - correct ans:Specifications



2. Title blocks on construction-drawing sheets are generally placed along the
left side of the sheet for ease of reading left to right.

T/F - correct ans:False



3. In construction drawings, the most important aspect of lettering is its
______________.

a. capitalization

b. stylization

c. readability

d. height

e. calligraphy - correct ans:Readability



4. The use of modular components in building construction is a common
practice, as many of the components are manufactured in standard sizes,
such as 16-, 24-, and ___________ (40.6-, 60.9-, and _______cm).

a. 48-inch (121.9-cm)

b. 30-inch (76.2-cm)

c. 18-inch (45.7-cm)

d. 15-inch (38.1-cm)

e. 9-inch (22.8-cm) - correct ans:a. 48-inch (121.9-cm)

, 5. Construction drawing legends combine graphic symbols with notes and
are used on what type of drawings?

a. floor plans

b. furniture plans

c. electrical plans

d. lighting plans

e. a and b only

f. c and d only

g. all of the above - correct ans:g. all of the above



6. In a building project, various contractual agreements are needed between
the parties involved in order to detail each party's responsibilities.

a. True

b. False - correct ans:a. True



7. For bidding purposes, specifications are referred to as "closed" or "open".
"Closed" means _____ product can be used on the project other than what is
specified.

a. a replacement

b. a and d only

c. any

d. a substituted

e. no - correct ans:e. no



8. Sometimes a designer will require the client to pay them a "retainer" (a
sum of money) at the beginning of a project. The usual retainer is what
percent of the total fees?

a. 2

Información del documento

Subido en
22 de septiembre de 2026
Número de páginas
31
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$14.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
1
Seguidores
0
Artículos
845
Última venta
4 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes