• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 13 páginas
Examen

Csx Freight Conductor Final Exam Correct 100%

Document preview thumbnail
Vista previa 2 fuera de 13 páginas

What hand signal is raised and lowered vertically? - ANSWERProceed What form is required to move a key train to show the hazmat position in a track? - ANSWERCT-168 True or False: When handling one or more clearance implicated shipments in a train, do not enter a yard or terminal where a yardmaster is on-duty until the yardmaster is informed of the shipment. - ANSWERTrue

Vista previa del contenido

CSX FREIGHT CONDUCTOR FINAL
EXAM CORRECT 100%
What hand signal is raised and lowered vertically? - ANSWERProceed

What form is required to move a key train to show the hazmat position in a track? -
ANSWERCT-168

True or False: When handling one or more clearance implicated shipments in a train, do
not enter a yard or terminal where a yardmaster is on-duty until the yardmaster is
informed of the shipment. - ANSWERTrue

What instructions are required to handle and move a clearance implicated shipment? -
ANSWERClearance Bureau Instructions

Your train is traveling at a speed of 42 miles per hour with a speed limit of 40 mph. This
means you are speeding by 2 mph. what do you do? - ANSWERTell the locomotive
operator to slow down

Your train is traveling at a speed of 47 MPH with a speed limit of 40. This means you
are speeding by 7 MPH. what do you do? - ANSWERTell the locomotive operator to
stop

Your equipment must not foul a track until it can be visually determined that: 2 Answers
- ANSWER1) The intended route is clear
2) Switches and derails connected with the movement are properly lined

The yardmaster tasked you with putting cars from track 11 into track 4. Track 4 does not
have a clearance marker clearly visible. How would you find the clearance point? 2
Answers - ANSWER1) Standing outside the rail and off the end of crosstie extend arm
toward the equipment
2) Identify the location equipment can no longer be touched and position equipment an
additional 50 ft into track from location identified

Multiple Part True or False:
After operating a switch or derail the employee must make certain the
1) Device has a reflective handle
2) Device is lined opposite movement
3) Lever is latched
4) If equipped, device is locked before being left unattended - ANSWER1) False
2) False
3) True
4) True

, When shoving equipment you must stop 150 ft before what? Select All That Apply -
ANSWER1) A Fixed Derail
2) An improperly lined switch

You are operating on the q79510 at max speed in CP territory and you experience an
air brake emergency what is required when permitted to proceed? - ANSWEROperate
the Train not to exceed 20 MPH for 1 train length

You have been switching and doubled your train, how do you protect the movement
when shoving? - ANSWERProtected by qualified employee on the leading end of the
track, on the ground ahead of the movement and clear of all tracks

Who is responsible for protecting a shove move? - ANSWERQualified Employee

After coupling cars to your locomotive what is your next step? - ANSWERStretch the
slack

When shoving or pushing where must the train be protected - ANSWERFrom the
leading end visually

What speed must not be exceeded when not moving to or from a main track operating a
hand operated switch - ANSWER10 MPH

Unless otherwise specified, authorized train speeds: - ANSWERApply to entire train

Which of the following statements is true about authorized train speeds? -
ANSWERMust Not Be Exceeded

You are leaving the main track, utilizing a hand operated switch, into a non signaled
siding what is your max speed? - ANSWER15 MPH

You are using a non signaled siding what is the speed you must follow - ANSWERMust
be able to stop in 1/2 the range of vision not exceeding 25 MPH

When there is a conflict of your authorized speed what speed are you governed by? -
ANSWERThe Lowest

Before coupling to equipment, what must you ensure? Select all that apply -
ANSWER1) Couplers are in line
2) At least 1 knuckle is open

What must be conducted before beginning any work activity? - ANSWERJob Briefing

When crossing tracks what must the employee do? 2 answers - ANSWER1) Stop and
look both directions
2) ensure they are at least 25 ft from standing equipment

Información del documento

Subido en
21 de septiembre de 2026
Número de páginas
13
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$15.39

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
shantelleG
4.1
(119)
Vendido
666
Seguidores
369
Artículos
18500
Última venta
2 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes