• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 23 páginas
Examen

CM 4221 Midterm Questions with Correct Answers (Grade A+)

Document preview thumbnail
Vista previa 3 fuera de 23 páginas

CM 4221 Midterm Questions with Correct Answers (Grade A+)

Vista previa del contenido

CM 4221 Midterm Questions with Correct Answers (Grade A+)

Question 1: Which of the following is not a method used to procure a constructor? Select one:
a. None of these
b. Best value
c. Job order contracting
d. Low bid
e. Qualifications-based selection

Answer: C. Job order contracting

Question 2: Which management activity listed below is where the project manager is tasked with
coordinating subcontractors, planning sequences of construction, and developing effective
communication? Select one:
a. None of these
b. Controlling
c. Organizing
d. Scoping
e. Planning

Answer: C. organizing

Question 3: This testing process helps to reduce the risk that major project systems (HVAC, electrical,
etc) will work according to the project objectives, plans, and specifications. Select one:
a. Commissioning
b. As-builts
c. None of these
d. Notice to Proceed
e. Constructability review

Answer: A. commisioning

Question 4: Vertical building projects are first designed by an architect and then engineered by design
engineers while horizontal infrastructure projects are typically designed and engineered by design
engineers True False

Answer: True

Question 5: Based on laws and regulations, privately financed projects must utilize competitive bidding
to procure a construction firm. Select one: True False

Answer: False




Page 1

,Question 6: An agency construction manager firm is contracted with the Owner, lead designer, and
construction firm on a project. Select one: True False

Answer: false

Question 7: A program manager is the same as a project manager. Select one: True False

Answer: false

Question 8: During the early stages of the engineering and design phase of a project, the Owner
typically procures the lead design firm using qualifications-based selection. Select one: True False

Answer: true

Question 9: What is the definition of a project delivery system? Select one:
a. The process by which the feasibility of a project is determined
b. None of these
c. The contractual relationships that exist between project team members
d. The method of procuring a constructor to build a project
e. The techniques and processes used for constructing a project

Answer: C. The contractual relationships that exist between project team members

Question 10: Which of the following delivery methods is the most used method in construction today?
Select one:
a. Design-Bid-Build
b. Design-Build
c. Construction Manager at-Risk
d. Multi-prime Contracting
e. None of these

Answer: A. Design-Bid-Build

Question 11: The quick ratio is calculated by adding all cash and receivables and dividing that value by
the total current liabilities for a company. Select one: True False

Answer: True

Question 12: Current liabilities can be converted into cash within one year to pay off debt Select one:
True False

Answer: False




Page 2

, Question 13: The straight line method of depreciation is a series of depreciation methods that calculates
more depreciation in the early years of an asset and less depreciation in later years Select one: True
False

Answer: False

Question 14: The only revenue recognition method acceptable for financial statement use for
construction companies is: Select one:
a. Straight accrual
b. Complete contract
c. Percentage of completion
d. Cash
e. None of these

Answer: C. Percentage of completion

Question 15: A firm's working capital will increase when: Select one:
a. The firm purchases equipment
b. The firm sells equipment
c. The firm pays off long term debt
d. None of these
e. The firm loses money on a job

Answer: B. The firm sells equipment

Question 16: What is retainage? Select one:
a. None of these
b. An amount of money that a contractor charges for overhead and profit to the Owner
c. A contractor fee used to retain a contractor for as long as the Owner needs work performed
d. An amount of money that an Owner provides to a contractor at the beginning of the project to help finance
the initial work
e. An amount of money that the Owner holds from every pay app to ensure the contractor continues the work as
business as usual

Answer: E. An amount of money that the Owner holds from every pay app to ensure the contractor
continues the work as business as usual




Page 3

Información del documento

Subido en
16 de septiembre de 2026
Número de páginas
23
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DrJon
3.8
(159)
Vendido
605
Seguidores
188
Artículos
25198
Última venta
8 horas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes