AMTRAK RWP EXAM SCRIPT COMPLETE QUESTIONS AND ANSWERS
◉ type of working limits on non-controlled track. Answer: inaccessible
track
◉ type of train approach warning. Answer: watchman
◉ type of train approach warning. Answer: individual train detection
◉ What type of work roadway workers do. Answer: inspection and
construction of track, maintenance of bridges, repair of signal and
communication systems, repair of RMM
◉ True or false. Fouling a track can apply to both people and machinery.
Answer: True
◉ Within what distance to the track is a roadway worker considered
fouling it. Answer: 4 feet from the nearest running rail
◉ a what authorizes movements on controlled track.. Answer:
Operator/Dispatcher
, ◉ The RWIC is required to be qualified on physical characteristics when
their group is working on..... Answer: All tracks
◉ The EIC is an employee who is in charge of..... Answer: A work group
◉ The main role of the RWIC is..... Answer: To establish on track safety
◉ When can personal electronic devices be used while on duty. Answer:
If there is an emergency at the job site and no other forms of
communication are available
◉ Prior to performing any task that requires fouling a track or has the
potential to foul a track, all roadway workers must participate in an.....
Answer: on-track safety briefing
◉ The safety briefing must be conducted..... Answer: At the job location
◉ Whistle boards are required when..... Answer: 5 or more employees
are working for more than 1 hour
◉ When using foul time with off-track equipment for more than 5
minutes on a main track you must use..... Answer: a supplemental
shunting device
◉ type of working limits on non-controlled track. Answer: inaccessible
track
◉ type of train approach warning. Answer: watchman
◉ type of train approach warning. Answer: individual train detection
◉ What type of work roadway workers do. Answer: inspection and
construction of track, maintenance of bridges, repair of signal and
communication systems, repair of RMM
◉ True or false. Fouling a track can apply to both people and machinery.
Answer: True
◉ Within what distance to the track is a roadway worker considered
fouling it. Answer: 4 feet from the nearest running rail
◉ a what authorizes movements on controlled track.. Answer:
Operator/Dispatcher
, ◉ The RWIC is required to be qualified on physical characteristics when
their group is working on..... Answer: All tracks
◉ The EIC is an employee who is in charge of..... Answer: A work group
◉ The main role of the RWIC is..... Answer: To establish on track safety
◉ When can personal electronic devices be used while on duty. Answer:
If there is an emergency at the job site and no other forms of
communication are available
◉ Prior to performing any task that requires fouling a track or has the
potential to foul a track, all roadway workers must participate in an.....
Answer: on-track safety briefing
◉ The safety briefing must be conducted..... Answer: At the job location
◉ Whistle boards are required when..... Answer: 5 or more employees
are working for more than 1 hour
◉ When using foul time with off-track equipment for more than 5
minutes on a main track you must use..... Answer: a supplemental
shunting device