• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 11 páginas
Examen

Mgsc 395 Correct Exams Answers And Questions Set A.pdf

Document preview thumbnail
Vista previa 2 fuera de 11 páginas

MGSC 395 CORRECT EXAMS ANSWERS AND QUESTIONS SET A.pdf

Vista previa del contenido

MGSC 395 CORRECT EXAMS ANSWERS AND
QUESTIONS SET A+
✔✔Measure for consistent quality - ✔✔percent errors in bill information and percent
errors in posting payments

✔✔Measure for delivery speed - ✔✔lead time to process merchant payments

✔✔Measure for volume flexibility - ✔✔utilization

✔✔Productivity - ✔✔the value of outputs (services and products) produced divided by
the values of input resources (wages, costs of equipment, and so on)

✔✔Two principles to keep in mind - ✔✔(1) each part of an organization, not just the
operations function, must design and operate processes that are part of a supply chain
and deal with quality, technology, and staffing issues. (2) each function of an
organization has its own identity and yet is connected with operations through shared
processes

✔✔Break even analysis - ✔✔helps the manager identify how much change in volume or
demand is necessary before a second alternative becomes better than the first
alternative

✔✔The preference matrix - ✔✔helps a manager deal with multiple criteria that cannot
be evaluated with a single measure of merit such as total profit or cost

✔✔Decision theory - ✔✔helps the manager choose the best alternative when outcomes
are uncertain

✔✔Break even quantity - ✔✔the volume at which total revenues equal total costs

✔✔Break even analysis - ✔✔the use of break even quantity; it can be used to compare
processes by finding the volume at which two different processes have equal total costs

, ✔✔Variable costs (cQ) - ✔✔the portion of the total cost that varies directly with volume
of output

✔✔Fixed cost (F) - ✔✔the portion of the total cost that remains constant regardless of
changes in levels of output

✔✔Total cost = - ✔✔F + cQ

✔✔Total revenue = - ✔✔pQ

✔✔Breakeven quantity - ✔✔Q = F / p - c

✔✔Sensitivity analysis - ✔✔a technique for systematically changing parameters in a
model to determine the effects of such changes

✔✔Project management - ✔✔a systemize, phased approach to defining, organizing,
planning, monitoring, and controlling projects

✔✔Program - ✔✔an independent set of projects that have a common strategic purpose

✔✔The roles that the project manager must play - ✔✔facilitator, communicator, and
decision maker

✔✔Characteristics that should be considered when selecting the project team -
✔✔technical competence, sensitivity, and dedication

✔✔Planning projects involves five steps - ✔✔(1) defining the work breakdown structure,
(2) diagramming the network, (3) developing the schedule, (4) analyzing cost-time
trade-offs, and (5) assessing risks

✔✔Work breakdown structure (WBS) - ✔✔a statement of all work that has to be
completed

✔✔Activity - ✔✔the smallest unit of work effort consuming both time and resources that
the project manager can schedule and control

✔✔Activity ownership - ✔✔avoids confusion in the execution of activities and assigns
responsibility for timely completion

✔✔Network diagram - ✔✔a network planning method, designed to depict the
relationships between activities that consists of nodes (circles), and arcs (arrows)

✔✔Critical path method (CPM) - ✔✔a network planning method developed in the 1950s
as a means of scheduling maintenance shutdowns at chemical-processing plants

Información del documento

Subido en
11 de septiembre de 2026
Número de páginas
11
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$19.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
5
Seguidores
2
Artículos
6166
Última venta
5 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes