PMT 360 Test 1 outlined Questions with correct Answers.

Document preview thumbnail
Vista previa 4 fuera de 36 páginas

PMT 360 Test 1 outlined Questions with correct Answers.

Vista previa del contenido

PMT 360 Test 1 outlined Questions with
correct Answers

,Following The MDD... - CORRECT ANSThe MDA determines entry point into the acquisition management
system



What is the DoD Information Network (DoDIN)? - CORRECT ANSThe globally interconnected set of
information capabilities for collecting, processing, storing, disseminating and managing information on
demand



Who is in charge of the WIPTs and is responsible for the program - CORRECT ANSPM



What ensures that new systems are "ready" to become a functioning element within the DoDI -
CORRECT ANSNR-KPP



What serves as a guide for the development of architectures? - CORRECT ANSDoD Architecture
Framework (DoDAF)



What does the DoDAF provide? - CORRECT ANSProvides the guidance and rules for developing,
representing, and understanding architectures based on a common denominator across DoD, Joint, and
multinational boundaries



What does an MOA cover at a minimum? - CORRECT ANSAt a minimum, the MOA covers key
issues/areas, specifically, system requirements, funding, manpower, Capability Development Document

(CDD)/Capability Production Document (CPD) approval process, and other program documentation.

What does an MOA cover at a minimum?



What is a "New Start"? - CORRECT ANSA program, subprogram, project, or subproject not previously
justified by the Department and funded by the Congress through the normal budget process



Program initiation requires technology to have been demonstrated in a __________, which is
considered equivalent to ___________. - CORRECT ANSrelevant environment

,Technology Readiness Level (TRL) 6.



How does DoD categorize technology maturity? - CORRECT ANSTechnology Readiness Levels (TRLs) are
the way DoD has chosen to categorize a program's

technology maturity



What are the three parameters of the Net-Ready KPP? - CORRECT ANSAttribute 1. Supports military
operations:

Attribute 2. Is entered and managed on the network

Attribute 3. Effectively exchanges information



What are the overarching requirement documents for cybersecurity? - CORRECT ANSDoDI 8510.01 Risk
Management Framework (RMF)



DoDI 8500.01 Cybersecurity



DoDI 5000.02 Operations of the Defense Acquisition System



Clinger - Cohen Act (Cybersecurity Strategy) is a requirement



Which KPP covers cybersecurity requirements? - CORRECT ANSSystem Survivability KPP



What are inherently governmental activities? - CORRECT ANSAn activity that is so intimately related to
the public interest as to mandate performance by government personnel, such as Program Managers,
Integrated Product Team Leads, Contracting

, What is sufficient internal capability? - CORRECT ANSRequires the agency to have an adequate number
of positions filled by Federal employees with appropriate training, experience, and expertise



When do you consider Corrosion Prevention Control (CPC) and why? - CORRECT ANSCorrosion
Prevention and Control (CPC) is important in the early stages in a system development to reduce the
Total Ownership Cost (TOC) (Early in the ACQ process)



When is the Corrosion Prevention and Control (CPC) drafted and when is it required? - CORRECT ANSCPC
will be drafted during the Materiel Solution Analysis phase and is required prior to MS B



Key Activities in CPC Planning include:

-Establish Corrosion Prevention Team (CPT)

-Create documentation to implement CPC planning

-Include CPC considerations in source selection criteria

-Designing, manufacturing, testing, and supporting of the system - CORRECT ANSWhat are some of the
key activities in Corrosion Prevention and Control (CPC) planning?



What are some general design and technical considerations for Corrosion Prevention and Control (CPC)?
- CORRECT ANSGeneral Design and Technical Considerations:

-Material Selections

-Protective Coatings

-Design Geometries

-Environmental Mitigation

-Process/Finish Specification

-Environmental Factors(wind, rain, sand, salt, humidity)

-System Operational Tempo

Información del documento

Subido en
4 de septiembre de 2026
Número de páginas
36
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
0
Artículos
79
Última venta
-



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes