• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 10 páginas
Examen

NACE CP2 ACTUAL FINALS ANSWERS AND QUESTIONS SURE A.pdf

Document preview thumbnail
Vista previa 2 fuera de 10 páginas

NACE CP2 ACTUAL FINALS ANSWERS AND QUESTIONS SURE A.pdf

Vista previa del contenido

NACE CP2 ACTUAL FINALS ANSWERS AND
QUESTIONS SURE A+
✔✔an electrolytic couple between a pipe and a casing

A. shields CP current from the pipeline.
B. causes a high current demand due to the casing.
C. allows CP current to access the pipeline.
D. causes corrosion on the outside of the casing - ✔✔C. allows CP current to access
the pipeline

✔✔With sufficient current applied to a pipeline which has an electrolytic couple to the
casing, the potentials will

A. shift electropositively on the outside of the casing
B. shift electropositively on the pipe inside the casing
C.shift electropositively on the inside of the casing
D. will be the same on the pipe and the casing - ✔✔C.shift electropositively on the
inside of the casing ?????

✔✔A stray current is a current that

A. goes back and forth
B. goes in an unintended path
C. goes only to a pipeline
D. does not complete a circuit - ✔✔B. goes in an unintended path

✔✔a mitigation control bond should be designed to

I. carry the necessary current.
II. restrict the current to that required to mitigate the problem.
III. keep the current going in one direction if necessary
IV. return the potential on the interfered with structure to its pre-interference state - ✔✔I,
II, III, and IV

, ✔✔a mitigation bond may cause more problems under which of the following
conditions?

I where the interfering structure bond point is more electropositive than the interfered
with structure.
II. where the interfering structure bond point is more electronegative than the interfered
with structure
III. where there are more than one, or changing, current discharge points
IV. where the interfering structure bond point potential varies from being more
electronegative to more electropositive than the interfered with structure. - ✔✔I, III, and
IV only

?????

✔✔AC voltages on pipelines do NOT result from

A. resistive (conductive) coupling
B. electrostatic (capacitive) coupling
C. electromagnetic induction coupling
D. thermodynamic coupling - ✔✔D. thermodynamic coupling

✔✔on a cathodically protected pipeline, AC corrosion can be expected at which current
densities?

I. 20 mA/m^2
II. 10 A/m^2
III. 110 A/m^2
IV. 200 A/m^2 - ✔✔III and IV only

i ac < 20 A/m^2 ..... no corrosion
20 A/m^2 < i ac < 100 A/m^2 ... corrosion unpredictable
i ac > 100 A/m^2 .... corrosion expected

✔✔The AC voltage-to-ground on a section of pipeline paralleling AND crossing a power
line tends to be highest

I. where the power line and pipeline cross
II. point where the power line and pipeline seperate
III. A gradient mat or a grid around above ground structures
IV. A remote ground away from the parallel section - ✔✔I and II only

✔✔Methods of lowering hazardous AC voltages include installing which of the
following?

Información del documento

Subido en
30 de agosto de 2026
Número de páginas
10
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EXAMCAFE
3.5
(41)
Vendido
291
Seguidores
11
Artículos
36202
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes