Examen

Qsp Final Exam Study Guide Exam With Correct Solutions./Graded A_+/

Document preview thumbnail
Vista previa 3 fuera de 29 páginas

QSP FINAL EXAM STUDY GUIDE EXAM WITH CORRECT SOLUTIONS./GRADED A_+/

Vista previa del contenido

QSP FINAL EXAM STUDY GUIDE EXAM WITH
CORRECT SOLUTIONS



1. A storm that produces ½ inch or more of precipitation, with a 48 hour or greater
period between rain events is a/an...



a. Qualifying rain event
b. Extended storm event
c. Inactive storm event
d. Unsafe monitoring event - -ANS☑️☑️--a. Qualifying rain event



2. A temporary or permanent structural BMP that directs concentrated flows away
from disturbed areas and prevents erosion is...



a. erosion control
b. run on/ run off control
c. sediment control - -ANS☑️☑️--b. run on/ run off control



3. Acceptable methods to demonstrate final stabilization include:



a. 50%vegetative coverage
b. 100% vegetative coverage
c. RUSLE 2 method - -ANS☑️☑️--c. RUSLE 2 method



4. Activities under the CGP include:

, a. Routine maintenance to maintain original line and grade, hydraulic
capacity, or original purpose of the facility.
b. Disturbances to land surfaces solely related to agricultural operations.
c. Clearing and grading 2 acres of land
d. Discharges of storm water from areas on tribal lands. - -ANS☑️☑️--c.
Clearing and grading 2 acres of land



5. A likely precipitation event is any weather pattern that is forecasted to have a ____%
or greater probability of producing precipitation in the project area.



a. 10
b. 25
c. 50
d. 75
e. 99 - -ANS☑️☑️--C



6. A QSP is responsible for:
a. Day to day implementation, inspections, and observations
b. Amending the SWPPP as required
c. Developing and certifying the SWPPP
d. Certifying reports in SMARTS - -ANS☑️☑️--a. Day to day implementation,
inspections, and observations



7. All NAL data must be uploaded within ___ after NAL exceedance has been
identified



a. 24 hours
b. 1 week
c. 10 days

, d. 2 weeks - -ANS☑️☑️--c. 10 days



8. Certain non-storm water discharges may be necessary for the completion of
construction projects. Therefore the General Permit authorizes such discharges
provided they meet the following conditions except:



a. Meet the NALs for pH and turbidity
b. Not cause or contribute to a violation of water quality standards
c. Comply with BMPs as described in the SWPPP
d. Be infeasible to eliminate
e. Causes or threatens to cause pollution, contamination, or nuisance - -
ANS☑️☑️--e. Causes or threatens to cause pollution, contamination, or
nuisance



9. Hydrologic source controls are a design technique that minimize and/or slow the
rate of stormwater runoff from the site. Examples include:



a. Reduction of pervious surfaces
b. Use of landscaping as a storm drain treatment feature
c. Drain rooftop downspouts to impervious areas
d. Stormwater treatment facility - -ANS☑️☑️--b. Use of landscaping as a
storm drain treatment feature



10. If the R Factor is ____, you can apply for the Erosivity Waiver.



a. 1
b. Less than 1
c. 5
d. Less than 5 - -ANS☑️☑️--d. Less than 5

Información del documento

Subido en
28 de agosto de 2026
Número de páginas
29
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$12.39

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
0
Artículos
281
Última venta
-




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes