• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 27 páginas
Examen

Qsp Final Exam Study Guide Exam With Correct Solutions.

Document preview thumbnail
Vista previa 3 fuera de 27 páginas

QSP FINAL EXAM STUDY GUIDE EXAM WITH CORRECT SOLUTIONS./GEADED A+

Vista previa del contenido

QSP FINAL EXAM STUDY GUIDE EXAM
WITH CORRECT SOLUTIONS

1. A likely precipitation event is any weather pattern that is forecasted to
have a ____% or greater probability of producing precipitation in the
project area.



a. 10
b. 25
c. 50
d. 75
e. 99 - ANSWER-C



2. A QSP is responsible for:
a. Day to day implementation, inspections, and observations
b. Amending the SWPPP as required
c. Developing and certifying the SWPPP
d. Certifying reports in SMARTS - ANSWER-a. Day to day
implementation, inspections, and observations



3. A storm that produces ½ inch or more of precipitation, with a 48 hour or
greater period between rain events is a/an...



a. Qualifying rain event
b. Extended storm event
c. Inactive storm event
d. Unsafe monitoring event - ANSWER-a. Qualifying rain event



4. A temporary or permanent structural BMP that directs concentrated
flows away from disturbed areas and prevents erosion is...



a. erosion control

, b. run on/ run off control
c. sediment control - ANSWER-b. run on/ run off control



5. Acceptable methods to demonstrate final stabilization include:



a. 50%vegetative coverage
b. 100% vegetative coverage
c. RUSLE 2 method - ANSWER-c. RUSLE 2 method



6. Activities under the CGP include:



a. Routine maintenance to maintain original line and grade,
hydraulic capacity, or original purpose of the facility.
b. Disturbances to land surfaces solely related to agricultural
operations.
c. Clearing and grading 2 acres of land
d. Discharges of storm water from areas on tribal lands. - ANSWER-
c. Clearing and grading 2 acres of land



7. All NAL data must be uploaded within ___ after NAL exceedance has
been identified



a. 24 hours
b. 1 week
c. 10 days
d. 2 weeks - ANSWER-c. 10 days



8. Certain non-storm water discharges may be necessary for the
completion of construction projects. Therefore the General Permit
authorizes such discharges provided they meet the following conditions
except:

, a. Meet the NALs for pH and turbidity
b. Not cause or contribute to a violation of water quality standards
c. Comply with BMPs as described in the SWPPP
d. Be infeasible to eliminate
e. Causes or threatens to cause pollution, contamination, or
nuisance - ANSWER-e. Causes or threatens to cause pollution,
contamination, or nuisance



9. Hydrologic source controls are a design technique that minimize and/or
slow the rate of stormwater runoff from the site. Examples include:



a. Reduction of pervious surfaces
b. Use of landscaping as a storm drain treatment feature
c. Drain rooftop downspouts to impervious areas
d. Stormwater treatment facility - ANSWER-b. Use of landscaping as
a storm drain treatment feature



10. If the R Factor is ____, you can apply for the Erosivity Waiver.



a. 1
b. Less than 1
c. 5
d. Less than 5 - ANSWER-d. Less than 5



11. NEL Violation Reports must be submitted to State Board within 24
hours after exceedance has been identified. NEL's are only subject to:



a. Risk Level 1
b. Risk Level 2
c. Risk Level 3
d. ATS Sites only - ANSWER-d. ATS Sites only

Información del documento

Subido en
28 de agosto de 2026
Número de páginas
27
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
1
Artículos
772
Última venta
-



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes