TEST BANK For Information Technology Project Management 9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13, Complete Newest Version

Document preview thumbnail
Vista previa 4 fuera de 684 páginas

TEST BANK For Information Technology Project Management 9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13, Complete Newest Version

Vista previa del contenido

TEST BANK For Information Technology
mm mm mm mm




mm Project Management 9th Edition
mm mm mm mm




Kathy Schwalbe, Verified Chapters
mm mm mm




Page 1 of
mm mm



684

,True / False
mm mm




1. Until the 1980s, project management primarily focused on providing schedule and resource data
mm mm mm mm mm mm mm mm mm mm mm mm



to top management in the military, computer, and construction industries.
mm mm mm mm mm mm mm mm mm mm



a. True
b. False
ANSWER: True
RATIONALE: Feedback: Until the 1980s, project management primarily focused on
mm mm mm mm mm mm mm mm


providing schedule and resource data to top management in the
mm mm mm mm mm mm mm mm mm mm


military, computer, and construction industries. Today’s project
mm mm mm mm mm mm mm


management involves much more, and people in every industry and
mm mm mm mm mm mm mm mm mm mm


every country manage projects.
mm mm mm mm



POINTS: 1
DIFFICULTY: Difficulty: Easy mm




REFERENCES: p.2
LEARNING OBJECTIVES: mm INFO.SCHW.14.1 - LO: 1-1 mm mm mm




NATIONAL STANDARDS: mm United States - BUSPROG: Technology
mm mm mm mm




TOPICS: Introduction
KEYWORDS: Bloom's: Knowledge mm




2. A difference between operations and projects is that operations end when their objectives
mm mm mm mm mm mm mm mm mm mm mm mm



have been reached, whereas projects do not.
mm mm mm mm mm mm mm



a. True
b. False
ANSWER: False
RATIONALE: Feedback: Projects are different from operations in that they end when
mm mm mm mm mm mm mm mm mm mm


their objectives have been reached or the project has been
mm mm mm mm mm mm mm mm mm mm


terminated.
mm



POINTS: 1
DIFFICULTY: Difficulty: Moderate mm




REFERENCES: p.4
LEARNING OBJECTIVES: mm INFO.SCHW.14.2 - LO: 1-2 mm mm mm




NATIONAL STANDARDS: mm United States - BUSPROG: Analytic
mm mm mm mm




TOPICS: What is a Project?
mm mm mm



KEYWORDS: Bloom's: Comprehension mm




3. Every project should have a well-defined objective.
mm mm mm mm mm mm



a. True




Page 2 of mm mm



684

,2



b. False
ANSWER: True
RATIONALE: Feedback: A project has a unique purpose. Every project should have a well-
mm mm mm mm mm mm mm mm mm mm mm mm


defined objective. mm




POINTS: 1
DIFFICULTY: Difficulty: Easy mm




REFERENCES: p.6
LEARNING OBJECTIVES:
mm INFO.SCHW.14.2 - LO: 1-2 mm mm mm




NATIONAL STANDARDS:
mm United States - BUSPROG: Analytic
mm mm mm mm




TOPICS: What is a Project?
mm mm mm



KEYWORDS: Bloom's: Knowledge mm




4. Projects should be developed in increments.
mm mm mm mm mm



a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project is developed using progressive elaboration. Projects are
mm mm mm mm mm mm mm mm mm


often defined broadly when they begin, and as time passes, the specific
mm mm mm mm mm mm mm mm mm mm mm mm


details of the project become clearer. Therefore, projects should be
mm mm mm mm mm mm mm mm mm mm


developed in increments.
mm mm mm



POINTS: 1
DIFFICULTY: Difficulty: Moderate mm




REFERENCES: p.6
LEARNING OBJECTIVES:
mm INFO.SCHW.14.2 - LO: 1-2 mm mm mm




NATIONAL STANDARDS:
mm United States - BUSPROG: Analytic
mm mm mm mm




TOPICS: What is a Project?
mm mm mm



KEYWORDS: Bloom's: Comprehension mm




5. Resources in a project should be used effectively because they are limited.
mm mm mm mm mm mm mm mm mm mm mm



a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project requires resources, often from various areas.
mm mm mm mm mm mm mm mm


Resources, however, are limited and must be used effectively to
mm mm mm mm mm mm mm mm mm mm


meet project and other corporate goals.
mm mm mm mm mm mm




POINTS: 1
DIFFICULTY: Difficulty: Moderate mm




REFERENCES: p. 7 mm




LEARNING OBJECTIVES:
mm INFO.SCHW.14.2 - LO: 1-2 mm mm mm




NATIONAL STANDARDS:
mm United States - BUSPROG: Analytic
mm mm mm mm




TOPICS: What is a Project?
mm mm mm



KEYWORDS: Bloom's: Comprehension mm




Page 3 of mm mm



684

, 3



6. A project manager’s primary role is to provide the funding for a project.
mm mm mm mm mm mm mm mm mm mm mm mm



a. True
b. False
ANSWER: False
RATIONALE: Feedback: A project sponsor usually provides the direction and funding for a
mm mm mm mm mm mm mm mm mm mm mm


mm project.
POINTS: 1
DIFFICULTY: Difficulty: Easy mm




REFERENCES: p.7
LEARNING OBJECTIVES: mm INFO.SCHW.14.2 - LO: 1-2 mm mm mm




NATIONAL STANDARDS: mm United States - BUSPROG: Analytic
mm mm mm mm




TOPICS: What is a Project?
mm mm mm



KEYWORDS: Bloom's: Knowledge mm




7. One of the main reasons why project management is challenging is because of the factor of
mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm



mmuncertainty.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project involves uncertainty. Every project is unique and thus
mm mm mm mm mm mm mm mm mm mm


mm it is sometimes difficult to define its objectives clearly, estimate how long
mm mm mm mm mm mm mm mm mm mm mm


mm it will take to complete, or determine how much it will cost. This
mm mm mm mm mm mm mm mm mm mm mm mm


mm uncertainty is one of the main reasons project management is so
mm mm mm mm mm mm mm mm mm mm


mm challenging.
POINTS: 1
DIFFICULTY: Difficulty: Moderate mm




REFERENCES: p.7
LEARNING OBJECTIVES: mm INFO.SCHW.14.2 - LO: 1-2 mm mm mm




NATIONAL STANDARDS: mm United States - BUSPROG: Analytic
mm mm mm mm




TOPICS: What is a Project?
mm mm mm



KEYWORDS: Bloom's: Comprehension mm




8. Questions about how a team will track schedule performance is related to a project’s scope.
mm mm mm mm mm mm mm mm mm mm mm mm mm mm



a. True
b. False
ANSWER: False
RATIONALE: Feedback: Project scope deals with questions such as, ―What work will be
mm mm mm mm mm mm mm mm mm mm mm


mm done as part of the project?‖, ―What unique product, service, or result
mm mm mm mm mm mm mm mm mm mm mm


mm does the customer or sponsor expect from the project?‖, or ―How will
mm mm mm mm mm mm mm mm mm mm mm


mm the scope be verified?‖
mm mm mm



POINTS: 1
DIFFICULTY: Difficulty: Moderate mm




REFERENCES: p.7

Page 3 of mm mm



684

Libro relacionado
 image
Editorial: 2018 ISBN: 9781337101356 Edición: Desconocido

Información del documento

Subido en
28 de agosto de 2026
Número de páginas
684
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$17.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ExamsAdept
3.3
(15)
Vendido
75
Seguidores
4
Artículos
1300
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes