Definition
Finish-to-finish
Give this one a try later!
The purchase of restaurant materials, such as paint, flooring, furniture, and
decorations, cannot be done until the design is approved by the owner.
What kind of relationship is this an example of?
If an owner reviews the decor after it is purchased, the design will need to
be refined with the owner's feedback. This indicates which kind of
relationship with the purchasing tasks?
The problem with using the ___ estimation method is that the people providing
the estimate can be too optimistic or too pessimistic, which results in unreliable
duration estimates.
The painter does painting before the flooring is installed, but also must return
after flooring installation to perform final painting touch-ups.
What kind of relationship is this an example of?
Don't know?
, 3 of 88
Definition
Deterministic
Give this one a try later!
If an owner reviews the decor after it is purchased, the design will need to be
refined with the owner's feedback. This indicates which kind of relationship with
the purchasing tasks?
During the construction of a gas pipeline, as soon as the crew begins digging the
trench and creates the start of the pipeline, the laying of the pipe can start. This is
the process of filling the trench.
What kind of relationship is this an example of?
The problem with using the ___ estimation method is that the people
providing the estimate can be too optimistic or too pessimistic, which
results in unreliable duration estimates.
Which of the following concepts can be important for creating accurate activity
duration estimates when the project includes tasks that are repeated?
Don't know?
, 4 of 88
Term
You cannot start the successor activity until the predecessor activity
has started in which type of relationship?
Give this one a try later!
Start-to-start Gantt chart
internal dependency Total Float
Don't know?
5 of 88
Definition
government regulations, deliverables, milestones, budgets
Give this one a try later!
Which data do task What are ways that the incremental
relationships depend upon? costs to schedule compression are
(Choose all that apply.) measured? (Choose all that apply.)
What is the downside of adding new
What is a project schedule network
resources in an effort to crash a
diagram?
project?
Correct
Incorrect
, 2 of 88
Definition
Finish-to-finish
Give this one a try later!
The purchase of restaurant materials, such as paint, flooring, furniture, and
decorations, cannot be done until the design is approved by the owner.
What kind of relationship is this an example of?
If an owner reviews the decor after it is purchased, the design will need to
be refined with the owner's feedback. This indicates which kind of
relationship with the purchasing tasks?
The problem with using the ___ estimation method is that the people providing
the estimate can be too optimistic or too pessimistic, which results in unreliable
duration estimates.
The painter does painting before the flooring is installed, but also must return
after flooring installation to perform final painting touch-ups.
What kind of relationship is this an example of?
Don't know?
, 3 of 88
Definition
Deterministic
Give this one a try later!
If an owner reviews the decor after it is purchased, the design will need to be
refined with the owner's feedback. This indicates which kind of relationship with
the purchasing tasks?
During the construction of a gas pipeline, as soon as the crew begins digging the
trench and creates the start of the pipeline, the laying of the pipe can start. This is
the process of filling the trench.
What kind of relationship is this an example of?
The problem with using the ___ estimation method is that the people
providing the estimate can be too optimistic or too pessimistic, which
results in unreliable duration estimates.
Which of the following concepts can be important for creating accurate activity
duration estimates when the project includes tasks that are repeated?
Don't know?
, 4 of 88
Term
You cannot start the successor activity until the predecessor activity
has started in which type of relationship?
Give this one a try later!
Start-to-start Gantt chart
internal dependency Total Float
Don't know?
5 of 88
Definition
government regulations, deliverables, milestones, budgets
Give this one a try later!
Which data do task What are ways that the incremental
relationships depend upon? costs to schedule compression are
(Choose all that apply.) measured? (Choose all that apply.)
What is the downside of adding new
What is a project schedule network
resources in an effort to crash a
diagram?
project?