WGU C722| PA| PRE-ASSESSMENT| PROJECT MANAGEMENT) EXAM QUESTIONS AND ANSWERS |FULLYSOLVED

Document preview thumbnail
Vista previa 4 fuera de 57 páginas

WGU C722| PA| PRE-ASSESSMENT| PROJECT MANAGEMENT) EXAM QUESTIONS AND ANSWERS |FULLYSOLVED

Vista previa del contenido

WGU C722 PA| PRE-ASSESSMENT | PROJECT MANAGEMENT|) EXAM QUESTIONS
AND ANSWERS




Correct

Incorrect




1 of 62

Term



In Project B, all of the scope must be completed, or the project will
fail. The work is important but not urgent.


Which triple constraint can be adjusted if the project's objective
requires the project team to work at the lowest possible cost?


a) Time
b) Cost
c) Incentives
d) Penalites



Give this one a try later!



d) Activity estimates d) Creating project schedules




a) Time b) 23

, Don't know?




2 of 62

Term


A project was authorized as an operational necessity to repair a
design flaw in the date field on a computer system that constrains
the year number to two digits instead of permitting the year to be
indicated with four digits. During execution of the activity concerned
with identifying the affected software, five relevant software
modules were discovered that had not been included in the scope
baseline. The project team must adjust the baselines to include the
omitted scope.


Which change management phase does this scenario describe?


a) Preparing for the change
b) Managing the change
c) Reinforcing the change
d) Upgrading the change



Give this one a try later!



b) Competitive necessity c) Scope reduction




a) Preparing for the change d) Creating project schedules


Don't know?

, 3 of 62

Term


Each project team member generated a series of questions to
evaluate three projects. A checklist was then compiled into one list
based on the frequency of question content, such as personnel,
materials, experience, and time.


What is a disadvantage of using this checklist approach?


a) Scoring models have not been integrated
b) Biases have not been eliminated
c) Numerical values have not bee itemized
d) Weighted values have not been considered



Give this one a try later!



c) Reduced quality of deliverables a) Lines of authority are clear




a&b


b) Biases have not been a) Operation impact has been built
eliminated in
b) Strategic impact has been
integrated


Don't know?




4 of 62

Definition

, To calculate money's worth today compared to in the future - Time
value of money


To calculate whether revenue tomorrow is greater than costs today -
Net present value


To calculate future cash flows using time and interest rate - Internal
rate of return


To calculate the alternative use of money - Opportunity cost

Give this one a try later!



During a certain project phase, specific blueprints are drawn and approved,
materials and labor costs are estimated, prototypes are created, and work
activities and tasks are identified. Also, quality expectations, measurements, and
costs are defined.


During which project phase do these activities occur?


a) Defining
b) Planning
c) Executing
d) Closing




In Project A, the contract specifies that time is very important. All of the scope
must be completed, or the project will fail. The project's objective requires the
project team to work as quickly as possible.


Which triple constraint can be adjusted to permit the project team to work as
quickly as possible?


a) Time
b) Cost
c) Price
d) Incentives

Información del documento

Subido en
25 de agosto de 2026
Número de páginas
57
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
millyphilip
3.6
(555)
Vendido
2967
Seguidores
1963
Artículos
46086
Última venta
14 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes