Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 7 páginas
Examen

NC Building Contractor Exam Study Test 2026/2027 | Latest Practice Questions & Exam Prep

Document preview thumbnail
Vista previa 2 fuera de 7 páginas

Prepare for the North Carolina Building Contractor License Exam with focused study-test material covering building construction, North Carolina building-code concepts, plans and specifications, estimating, construction practices, contractor responsibilities, ethics, laws, liens, and other exam-relevant topics. Designed for candidates preparing for the NCLBGC Building Contractor classification, this resource provides targeted practice and review to strengthen exam readiness. Latest release for the 2026/2027 academic year.

Vista previa del contenido

NC Building Contractor Exam Study Test

Refer to the Building Exam Blueprints to answer this 96.3
question. What is the elevation of the top of W14 x 43 near
intersection D-2


Loose brick stacks shall not be more than _______ feet in 4
height.



Determine the estimated cost of a new project, if an $132,547
identical project's direct cost was $110,530 and the
overhead cost was $17,250, if the overhead increases 2%
and the direct cost.


Concrete should be poured prior to the mixing drum 300
turning ______ revolutions.



If the run of the standard rafter is 12', what is the run of the 17
king hip?



Which of the following is not an advantage of a sole Ownership is readily transferable
proprietorship?



The total area of mezzanies shall not exceed ________ of 1/3
the room in which it is located.



An employee's right-to-know about materials that he uses Hazard communication
applies to _________



Which of the following types of rock is considered easiest sedimentary
to rip?



What is a performance bond? A document which provides that the project will be completed




Refer to the Building Exam Blueprints to answer this 72.5
question. The building sets __________ feet from the
Loraine Street right-of-way?


The Schedule of Values for a job shows Task A worth $4,080
$12,000, Task B worth $8,500 and Task C worth $25,000.
Task A is 18% complete. Task B is 2% complete. Task C is
7% complete. What is the value of the percentage?


If an internal combustion engine is being operated inside a The engine must be vented to outside the building
building under construction, which of the following would
be true?


Means of egress to a building must be illuminated for 90 mins
__________ minutes after power failure.



Refer to the Building Exam blueprints to answer this $2,242
question. What is the total cost of the 14J6 joist if the unit
price is $1.12 per pound?

, NC Building Contractor Exam Study Test

A church with an occupant load of greater than _________ 300
persons must have a fire alarm.



What is the name of the longitudinal board used to connect Ledger
a desk to the house?



If your account balance is $50,665 on June 1st and during $43,010
June you pay $10,630 worth of invoices, your service fee
is $25, you deposit $3,000, and the bank makes a mistake
and overcharges your account $600, what is your actual
balance on July?


Except where otherwise specified in OSHA manual, the 18
scaffold platform must be at least _______



The first layer of a BUR system is attached to the desk Nails
using ________



Shear walls resist ________ forces. Lateral




The cut of a control joint in a slab should be approximately 1/4
_________ the thickness.



Refer to the Building Exam Blueprints to answer this more than 9 tons
question. The total weight of all W18x40 steel members is
________


Which of the following would be the best procedure to check in/check out method
know how many employees are on the clock?



Which of the following would not be considered a current office building
asset?



Which of the following materials are not used to fireproof Styrofoam
steel columns?



The bearing depth of an open web joist is _______ inches. 2 1/2




The preferred method to attach gutters to a facial board is with a strap band
________.



Concrete masonry units should be wet down ________. never

Información del documento

Subido en
22 de agosto de 2026
Número de páginas
7
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$9.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TestproCenter
4.6
(19)
Vendido
61
Seguidores
0
Artículos
2915
Última venta
4 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes