• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 20 páginas
Examen

Cmit Capstone Practice Questions And Answers Full Study Package

Document preview thumbnail
Vista previa 3 fuera de 20 páginas

CMIT CAPSTONE PRACTICE QUESTIONS AND ANSWERS FULL STUDY PACKAGE

Vista previa del contenido

CMIT CAPSTONE PRACTICE QUESTIONS
AND ANSWERS FULL STUDY PACKAGE

●● Which provision is LEAST likely to appear in the Agreement?
Answer: Profit/overhead %.


●● Why might an owner prefer a Fixed Price / Lump Sum contract in
DBB?
Answer: To know cost upfront and shift overrun risk.


●● Which risk is the OWNER most exposed to under the Design-Bid-
Build method?
Answer: Contractor claims from design errors/omissions.


●● In cost reimbursement contracts, CM multiplier includes:
Answer: Salary, overhead, profit.


●● Which of the following BEST illustrates the flexibility private sector
owners have compared to public sector owners?
Answer: A hotel chain hires a contractor based on prior relationships and
reputation.

,●● Which statement BEST explains the link between owner expertise
and delivery method selection?
Answer: First-time owners may rely on Agency CM to compensate for
lack of in-house capacity.


●● Which of the following is NOT typically covered by a GMP under
CMAR?
Answer: Inflation after GMP is set.


●● Which example BEST illustrates the distinction between a program
and a project?
Answer: Building a $30M chemistry facility vs. coordinating multiple
science facilities under one initiative.


●● Why does the Brooks Act (1972) require QBS for professional
services?
Answer: Ensure trust, expertise, quality over price.


●● Which scenario is MOST appropriate for Time & Materials?
Answer: Emergency post-hurricane repairs with uncertain scope.


●● A contractor fails to acknowledge addendum in bid. Result?
Answer: Bid rejected as nonresponsive.

, ●● Which innovation by George Fuller in the 1880s MOST directly
shaped modern project delivery?
Answer: The general contractor model with fixed-price contracts.


●● Why did Construction Manager at-Risk (CMAR) emerge in the mid-
1980s?
Answer: Disputes and delays with traditional methods drove demand for
hybrid approaches.


●● A CM is asked to draft the legal contract between the owner and
contractor. What should the CM do?
Answer: Decline, explaining that CMs don't write contracts or provide
legal services.


●● A project team adopts Lean Construction with pull planning and
daily huddles. What is the PRIMARY expected outcome?
Answer: Reduced workflow variability and fewer delays.


●● Which of the following is MOST likely to be classified as a semi-
public owner?
Answer: A regional airport authority upgrading terminals.


●● A hospital expansion project is experiencing significant delays and
cost overruns. What is the MOST likely root cause?

Información del documento

Subido en
20 de agosto de 2026
Número de páginas
20
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
FocusFile7
4.0
(28)
Vendido
297
Seguidores
4
Artículos
75553
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes